Skip to main content

Brisbane expressway opens to traffic

The Legacy Way expressway, in Brisbane, Australia, is now open to traffic. The seven kilometre long expressway is approximately and includes one 4.6 kilometre long twin-tube tunnel connecting the Western Freeway with the Inner City Bypass. Traffic on the expressway is forecast to rise from 34,200 vehicles on an average weekday to 50,800 in 2026. Brisbane City Council (BCC) awarded the contract for the design, construction, operation and maintenance of the seven kilometre long expressway to the Transcity
July 13, 2015 Read time: 2 mins
The Legacy Way expressway, in Brisbane, Australia, is now open to traffic. The seven kilometre long expressway is approximately and includes one 4.6 kilometre long twin-tube tunnel connecting the Western Freeway with the Inner City Bypass. Traffic on the expressway is forecast to rise from 34,200 vehicles on an average weekday to 50,800 in 2026.

Brisbane City Council (BCC) awarded the contract for the design, construction, operation and maintenance of the seven kilometre long expressway to the Transcity joint venture, which awarded 7319 Egis a ten-year contract for operation and maintenance to.

The project includes two separate parallel road tunnels, one for the eastbound traffic and one for the westbound traffic, each with two lane carriageways and connected by cross passages every 120 metres without lay-bys or breakdown bays. It also includes tunnel portals on the Western Freeway at Toowong and the Inner City Bypass at Kelvin Grove, along with the tunnel management system, fire safety, mechanical and electrical systems, ventilation systems, adaptation of existing roads to connect the tunnels to the existing network and a free flow electronic tolling system, which is not part of the contract.

Related Content

  • Egis to operate toll road in Uganda 
    April 28, 2021
    Kampala-Entebbe Expressway contract part of overall strategy to ease congestion
  • Integrate systems to reduce roadside infrastructure
    January 27, 2012
    David Crawford reviews promising current developments. Instrumentation of the road infrastructure has grown to become one of the most dynamic sectors of the ITS industry. Drivers for its deployment include global concerns over the commercial and environmental pressures of traffic congestion, the importance of keeping drivers informed throughout their journeys, and the need to reduce accident rates and promote the safety of all road users, for example by enforcing traffic safety rules.
  • Iteris wins $6.9m contract in San Francisco
    October 12, 2020
    Company is also to carry out traffic signal synchronisation project in Orange County 
  • TransCore to upgrade Delaware River bridge toll system
    October 1, 2015
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.