Skip to main content

Auckland considers road user charging to plug funding shortfall

Auckland, New Zealand, faces a US$9.5 billion transport funding gap to build the fully-integrated transport network set out in the 30-year Auckland Plan that includes new roads, rail, ferries, busways, cycle-ways and supporting infrastructure needed to cope with a population set to hit 2.5 million in the next three decades. If Auckland opts to pay for the fully-integrated Auckland Plan, Auckland Council officials claim the transport network congestion is expected to improve by 20 per cent over the next 1
October 29, 2014 Read time: 2 mins
Auckland, New Zealand, faces a US$9.5 billion transport funding gap to build the fully-integrated transport network set out in the 30-year Auckland Plan that includes new roads, rail, ferries, busways, cycle-ways and supporting infrastructure needed to cope with a population set to hit 2.5 million in the next three decades.

If Auckland opts to pay for the fully-integrated Auckland Plan, Auckland Council officials claim the transport network congestion is expected to improve by 20 per cent over the next 10 years compared with where the city’s traffic problems are currently heading.

The higher level of transport performance will also deliver economic benefits to the Auckland region of US$1.3 billion in improved productivity and reduced costs.

An Independent Advisory Body (IAB) has worked out two ways Auckland could fund the fully-integrated transport system. One way is agree to increase petrol price by 1.2 cents a litre (in addition to increases signalled by the government) and share the rest of the cost equally amongst ratepayers. This would mean an increase in average general rates of around one per cent per year, in addition to increases signalled by the council, over the next ten years.

The other suggestion is to charge the motorway users an average user fee of US$1.6 depending the time of day or day of the week they use the motorway.

The government has criticised the proposals, however.

Transport Minister Simon Bridges said he was "very sceptical" about the options presented today by an Independent Advisory Body (IAB) to the Auckland Council.

Bridges said the Government was already spending about US$794 million a year on Auckland's transport network. "These projects will make a big difference to congestion in Auckland," he said.

"But we remain very sceptical about the options being presented today to Aucklanders and whether the programme proposed will further alleviate congestion. Aucklanders would need a very clear sense of what results they are getting and whether the new projects would deliver tangible value for money for commuters. They also need to have the discussion about how much more Aucklanders are prepared to pay for their transport."

The council says no decision will be made without extensive consultation with residents, which commences in January 2015.

Related Content

  • Shock therapy: jolt for EV charging needed
    October 2, 2018
    As sales of electric vehicles accelerate, the growth of charging infrastructure is in need of a big boost. Graham Anderson reports on whether Europe is up to it. Utilities, technology companies and vehicle manufacturers are battling to put in place new charging networks for electric vehicles (EVs) across Europe in response to a predicted dramatic surge in demand. Market experts believe that rapidly falling battery costs – which make up about one third of the costs of an electric car – and growing
  • EU releases first transport infrastructure funds
    April 8, 2014
    Following its decision in March to make the first US$16.4 billion tranche of funding available for trans-European transport network projects, the European commission has now adopted the first work programmes within this framework: a multi-annual work programme covering larger projects with a total budget of US$15.1 billion and an annual work programme for 2014 addressing smaller projects with a budget of US1.3 billion. The funding priorities set out in these programmes include: The closing of missing lin
  • Impact of US economic stimulus programme on ITS industry
    August 2, 2012
    Pete Goldin reports on the public sector perspective in this second article exploring the impact of the US economic stimulus programme on the domestic ITS industry The American Recovery and Reinvestment Act (ARRA) was enacted in February 2009 to help stimulate the US economy in the face of global recession. Of measures worth a nominal total of $787 billion, the US Department of Transportation (USDOT) received just over $48 billion with which to promote short-term economic recovery and an additional $1.5 bil
  • The long road to Spanish enlightenment
    October 22, 2018
    Julián Núñez, immediate past president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid. Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth: people want to avoid the pain. But pain is something that Spanish operators, including Abertis, OHL, ACS, FCC and Acciona, have been going through for the past decade. The country has