Skip to main content

Solar assisted arrow warning sign

Work Area Protection has announced the ArrowMaster Pro-Line Solar-Assisted Advance Warner, a versatile, low-operating-cost arrow board that provides maximum visibility while directing traffic through construction zones. It was designed to allow the panel to travel parallel with the towing vehicle to cut wind resistance, fatigue and maximise fuel economy. The centre frame support is continuous from front to rear to reduce stress fractures caused by towing and rough roads. The company says that ArrowMaster bo
January 31, 2012 Read time: 1 min
1922 Work Area Protection has announced the ArrowMaster Pro-Line Solar-Assisted Advance Warner, a versatile, low-operating-cost arrow board that provides maximum visibility while directing traffic through construction zones. It was designed to allow the panel to travel parallel with the towing vehicle to cut wind resistance, fatigue and maximise fuel economy. The centre frame support is continuous from front to rear to reduce stress fractures caused by towing and rough roads. The company says that ArrowMaster boards conform to and, in most cases, exceed all federal and state MUTCD specifications.

For more information on companies in this article

Related Content

  • Volvo standardises anti-collision system
    July 23, 2014
    Volvo will unveil ‘the most comprehensive and technologically sophisticated standard safety package available in the automotive industry’ next month when it launches its all-new XC90 all-wheel drive SUV. The standard safety package will include an auto brake at intersection capability and run-off road protection. The auto brake at intersection function automatically applies the brakes if the driver turns in front of an oncoming car. On-board systems detect a potential crash and automatically apply the br
  • Variable message signs continue to deliver travel information
    February 2, 2012
    Arguably the 'face' of ITS, variable message signs are far from being a passing solution
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • ITS technology reduces congestion, improves workzone safety
    July 17, 2012
    As the road-building season gets under way in the US, the Federal Highway Administration has just published a White Paper which deals with the use of ITS technology in work zones. On 30 April 2009, the US Federal Highway Administration (FHWA) published a White Paper which was prepared by the US Department of Transportation (USDOT) to inform public agencies about the use of ITS to manage construction work zones. This is a particularly relevant topic given the large number of construction projects that are ex