Skip to main content

Real time information delivers safer work zone

Beginning in June 2011, Massachusetts Department of Transportation (MassDOT) began replacing 14 deteriorated bridge superstructures on Interstate 93 throughout the city of Medford. The project has been called the 93 FAST 14, and because of its impact on the travelling public Mass DOT has implemented the use of Smart Work Zone technology.
January 31, 2012 Read time: 2 mins
The data collection devices being utilised on the MassDOT 1-93 project are compromised of the ASTI Transportation Systems Queue Trailer with attached Wavetronix sensor

Beginning in June 2011, Massachusetts Department of Transportation (MassDOT) began replacing 14 deteriorated bridge superstructures on Interstate 93 throughout the city of Medford. The project has been called the 93 FAST 14, and because of its impact on the travelling public Mass DOT has implemented the use of Smart Work Zone technology.

The goal of the system, from 1933 ASTI Transportation Systems, is to monitor the project work zone and disseminate real-time information to MassDOT personnel, the local highway operations centre and the travelling public. Traffic conditions are expected to deteriorate because of queueing caused by high traffic volumes, work zone vehicle interference, inclement weather and grade changes. MassDOT has requested that the system provide notifications of traffic decreasing below 45 mph.

 The Smart Work Zone System on this project is not only providing minute-by-minute data collection through the use of 148 Wavetronix sensors but is also going a step further to integrate BlueToad-1835 Bluetooth technology and the integration of the State's 295 Navteq data collection to deliver the highest-quality and most timely data possible. This will allow MassDOT personnel to make incident management decisions as well as provide the travelling public with the most current information available. Having the ability to make these decisions far enough in advance of the work zone will empower the travelling motorist with re-routing capabilities, more efficient trip planning, or quite simply a safer trip through the work zone environment.

The Smart Work Zone System is controlled via a central project webpage (http://208.11.154.237/tcm/bostontunnel) and is provided in both a public viewing format and an administrative format. The administrative level, through username/password protection, allows MassDOT personnel to log directly into each device for detailed data, overriding of message boards and pan/tilt/zoom control over the Vicon cameras on the project. Implementation of this technology offers the DOT personnel complete oversight and control of all devices within the work zone, which hopefully provides the safest travelling environment possible without shutting down the road completely.

"Smart Work Zone Systems empower the driver with the ability to make informed decisions and efficient trip planning. This translates to not only a safer environment for both the motorist and the highway personnel but also a more comfortable travelling experience," says Todd Hartnett, business development manager, ASTI Transportation Systems.

For more information on companies in this article

Related Content

  • Developing a wireless cooperative traffic management system
    March 14, 2012
    The use by MDOT of 90-foot concrete poles on which to mount CCTV equipment reduces the number of poles needed to monitor a given area and incidences of occlusion
  • New Zealand launches Bluetooth ITS trial
    June 13, 2013
    A trial using wireless communications technology to deliver real-time traffic information has been launched by New Zealand’s Ministry of Transport and ITS consultants AraFlow. The Co-operative Intelligent Transport Systems trial will investigate whether providing accurate real-time information about traffic conditions to participating commercial transport operators improves the productivity of freight movements. Ministry of Transport Chief Executive Martin Matthews says “We are testing whether this informat
  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • Preparing for connected vehicle technology challenge
    December 14, 2012
    A decision on mandating connected vehicle technology is expected in 2013, when associated political issues such as privacy are likely to come to the fore. Pete Goldin investigates industry’s preparations for the challenge. Once in a while new technology comes along with the power to revolutionise the way we live our lives. Connected vehicle technology could be such a game changer. If mandated in the United States, it could quickly become the status quo for transportation in the US, and such a disruptive cha