Skip to main content

Innovative traffic information system

From the roadside James Foster compiles some eye-catching news, deployments and product picks from the work zone
January 31, 2012 Read time: 3 mins
"We put a high emphasis on minimising the inconvenience to the travelling public"

From the roadside James Foster compiles some eye-catching news, deployments and product picks from the work zone

1904 Utah Department of Transportation (UDOT) and contractor, Provo River Constructors (Fluor, Ames Construction, 1905 Ralph L. Wadsworth Construction, Wadsworth Brothers Construction joint venture), partnered with 139 Transcore to develop an innovative approach to provide real-time arterial traffic information during the I-15 Corridor Expansion (I-15 CORE) and minimise traffic delays for local motorists. The system extends the concept and success of freeway management travel time systems to the arterial roadways during construction.

UDOT began a US$1.725 billion project last April, the largest roadway project in the state's history, to widen and rebuild some 39km of I-15 in Utah County nearly 50km south of Salt Lake City. The I-15 CORE project is currently 30 per cent complete and on schedule for its December 2012 deadline. The project is an important investment to restore aging infrastructure, address long-term transportation needs, and improve the movement of goods and services throughout the state in one of the state's fastest-growing counties.

Because the project will span more than two years and there is no other freeway system in the county apart from I-15, the project leaders knew there would be significant effects on traffic on the local streets.
Eric Rasband, UDOT I-15 CORE traffic and maintenance of traffic manager: "We put a high emphasis on minimising the inconvenience to the travelling public. Under a competitive bidding environment, our contractor, PRC, looked for an opportunity to improve mobility on local roads throughout construction as a value-add in their overall traffic management proposal. PRC asked 139 Transcore to design and construct a traffic management system that extends the concept and success of freeway management travel time systems to the arterial roadways during construction and one that will continue to help drivers make informed choices when the freeway reconstruction is complete."

The travel time application designed by TransCore includes the installation of a monitoring system along US 89 and connector routes to I-15, which uses anonymous vehicle data obtained from 119 Sensys Networks travel time detectors. This data is used to measure actual traffic flow conditions. The information is then fed directly to TransCore's TransSuite software to automatically update roadway Trailblazer signs with current travel time information. This system also feeds information directly into the Utah CommuterLink website to allow motorists access to information before their trips begin.
Nine Trailblazer signs placed on the roadside include a hybrid display that combines a static message with a dynamic insert that incorporates real-time data. The small size of the sign allows for placement in areas with little or no need for the acquisition of right of way. Motorists are directed to take the least congested routes - either I-15 or US 89 - which leads to a reduction in delays, stops, emissions and the number and severity of traffic incidents.

An accelerated schedule of six months for design, construction and software development allowed the Trailblazer project to come to fruition in time to provide a positive impact for the remainder of I-15 CORE construction and into the future.

According to UDOT, the Trailblazer signs are unique as they compare local road travel times versus freeway travel times. Other signs like these in Utah show freeway travel times only. This system does not just provide an immediate benefit to traffic management during the I-15 CORE project: the installations will be left in place once construction has been completed, becoming a legacy product to enhance regional mobility.

Related Content

  • ITS asset management matters
    April 26, 2013
    Maintenance of on-road ITS kit needs to become more sophisticated; while new technologies can deliver better road maintenance. David Crawford investigates both sides of the issue "Good information is key to effective ITS asset maintenance,” says Ian Routledge of the Ian Routledge Consultancy (IRC), whose Imtrac (Information Management for TRAffic Control) system is poised for European expansion. Developed as an ‘intelligent filing cabinet’ for storing information about on-road equipment, the online database
  • Sensys automates statistics processing
    October 11, 2016
    Sensys Networks is featuring its SensTraffic platform that provides automated statistical processing of precise traffic detection data, detailed performance measures, and remote network monitoring and diagnostics. Designed for arterial and freeway traffic data collection, SensFlow provides accurate volume, occupancy and speed reports. These real-time traffic data measures allow monitoring of congestion to optimise traffic operations. When used in conjunction with SensID data, the company says it gives un
  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    September 14, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • TransCore wins Scats deployment contract
    April 27, 2012
    TransCore has been selected by Cobb County Department of Transportation, Atlanta, to expand its Scats (Sydney Coordinated Adaptive Traffic System) adaptive traffic signal control technology with an additional 75 intersections, nearly doubling its use of the technology and making it the second largest deployment in the United States. The first phase of 26 intersections in the town centre area are now in operation with the remaining intersections expected to be fully operational by October 2012.