Skip to main content

Innovative traffic information system

From the roadside James Foster compiles some eye-catching news, deployments and product picks from the work zone
January 31, 2012 Read time: 3 mins
"We put a high emphasis on minimising the inconvenience to the travelling public"

From the roadside James Foster compiles some eye-catching news, deployments and product picks from the work zone

1904 Utah Department of Transportation (UDOT) and contractor, Provo River Constructors (Fluor, Ames Construction, 1905 Ralph L. Wadsworth Construction, Wadsworth Brothers Construction joint venture), partnered with 139 Transcore to develop an innovative approach to provide real-time arterial traffic information during the I-15 Corridor Expansion (I-15 CORE) and minimise traffic delays for local motorists. The system extends the concept and success of freeway management travel time systems to the arterial roadways during construction.

UDOT began a US$1.725 billion project last April, the largest roadway project in the state's history, to widen and rebuild some 39km of I-15 in Utah County nearly 50km south of Salt Lake City. The I-15 CORE project is currently 30 per cent complete and on schedule for its December 2012 deadline. The project is an important investment to restore aging infrastructure, address long-term transportation needs, and improve the movement of goods and services throughout the state in one of the state's fastest-growing counties.

Because the project will span more than two years and there is no other freeway system in the county apart from I-15, the project leaders knew there would be significant effects on traffic on the local streets.
Eric Rasband, UDOT I-15 CORE traffic and maintenance of traffic manager: "We put a high emphasis on minimising the inconvenience to the travelling public. Under a competitive bidding environment, our contractor, PRC, looked for an opportunity to improve mobility on local roads throughout construction as a value-add in their overall traffic management proposal. PRC asked 139 Transcore to design and construct a traffic management system that extends the concept and success of freeway management travel time systems to the arterial roadways during construction and one that will continue to help drivers make informed choices when the freeway reconstruction is complete."

The travel time application designed by TransCore includes the installation of a monitoring system along US 89 and connector routes to I-15, which uses anonymous vehicle data obtained from 119 Sensys Networks travel time detectors. This data is used to measure actual traffic flow conditions. The information is then fed directly to TransCore's TransSuite software to automatically update roadway Trailblazer signs with current travel time information. This system also feeds information directly into the Utah CommuterLink website to allow motorists access to information before their trips begin.
Nine Trailblazer signs placed on the roadside include a hybrid display that combines a static message with a dynamic insert that incorporates real-time data. The small size of the sign allows for placement in areas with little or no need for the acquisition of right of way. Motorists are directed to take the least congested routes - either I-15 or US 89 - which leads to a reduction in delays, stops, emissions and the number and severity of traffic incidents.

An accelerated schedule of six months for design, construction and software development allowed the Trailblazer project to come to fruition in time to provide a positive impact for the remainder of I-15 CORE construction and into the future.

According to UDOT, the Trailblazer signs are unique as they compare local road travel times versus freeway travel times. Other signs like these in Utah show freeway travel times only. This system does not just provide an immediate benefit to traffic management during the I-15 CORE project: the installations will be left in place once construction has been completed, becoming a legacy product to enhance regional mobility.

Related Content

  • TransCore integrates its TransSuite traffic management system in Ecuador
    May 5, 2017
    TransCore has been selected by the Municipal Transit Authority of the City of Guayaquil, Ecuador, to integrate its TransSuite software solution with the City’s existing traffic signal controllers in a bid to improve the coordination of multiple traffic management systems. Phase 1 of the project has been deployed and created an integrated system to work with controllers from multiple different manufacturers, as well as the City’s SCATS-based adaptive traffic management system. It also included a pilot imple
  • Dedicated lane DMS
    July 19, 2012
    Daktronics has announced the addition of a new ITS LED display to its current line of widely used Vanguard Dynamic Message Signs (DMS). The Vanguard VM-1020 Dedicated Dynamic Message Sign, or DDMS, is designed to provide a reliable signage solution dedicated to travel time, toll rate (such as high-occupancy toll lanes) and other managed lane applications.
  • New York City, one traffic control centre, 10,000 intersections
    September 9, 2014
    The New York City Department of Transportation (NYCDOT) recently became the first in the world to actively manage and control more than 10,000 signalised intersections from a single traffic management centre and one integrated system. TransCore designed and installed the central traffic control system in 21006, including the modernisation of intersection control equipment, implementation of a central traffic control system and support of the City’s wireless communications network. The City’s US$120
  • Emissions reductions targets to have major impact on transport
    October 28, 2015
    As bold moves aimed at reducing greenhouse gas emissions have been introduced in California, David Crawford looks at the ramifications for transportation. California Governor Jerry Brown’s recent dramatic raising of the bar on emissions reduction policy for the state has won him praise from Japan, Australia, Europe and the secretariat of the critical UN conference on climate change being held in Paris in November/December 2015. His April 2015 executive order aimed at bringing emissions to 40% below 1990 lev