Skip to main content

Innovative traffic information system

From the roadside James Foster compiles some eye-catching news, deployments and product picks from the work zone
January 31, 2012 Read time: 3 mins
"We put a high emphasis on minimising the inconvenience to the travelling public"

From the roadside James Foster compiles some eye-catching news, deployments and product picks from the work zone

1904 Utah Department of Transportation (UDOT) and contractor, Provo River Constructors (Fluor, Ames Construction, 1905 Ralph L. Wadsworth Construction, Wadsworth Brothers Construction joint venture), partnered with 139 Transcore to develop an innovative approach to provide real-time arterial traffic information during the I-15 Corridor Expansion (I-15 CORE) and minimise traffic delays for local motorists. The system extends the concept and success of freeway management travel time systems to the arterial roadways during construction.

UDOT began a US$1.725 billion project last April, the largest roadway project in the state's history, to widen and rebuild some 39km of I-15 in Utah County nearly 50km south of Salt Lake City. The I-15 CORE project is currently 30 per cent complete and on schedule for its December 2012 deadline. The project is an important investment to restore aging infrastructure, address long-term transportation needs, and improve the movement of goods and services throughout the state in one of the state's fastest-growing counties.

Because the project will span more than two years and there is no other freeway system in the county apart from I-15, the project leaders knew there would be significant effects on traffic on the local streets.
Eric Rasband, UDOT I-15 CORE traffic and maintenance of traffic manager: "We put a high emphasis on minimising the inconvenience to the travelling public. Under a competitive bidding environment, our contractor, PRC, looked for an opportunity to improve mobility on local roads throughout construction as a value-add in their overall traffic management proposal. PRC asked 139 Transcore to design and construct a traffic management system that extends the concept and success of freeway management travel time systems to the arterial roadways during construction and one that will continue to help drivers make informed choices when the freeway reconstruction is complete."

The travel time application designed by TransCore includes the installation of a monitoring system along US 89 and connector routes to I-15, which uses anonymous vehicle data obtained from 119 Sensys Networks travel time detectors. This data is used to measure actual traffic flow conditions. The information is then fed directly to TransCore's TransSuite software to automatically update roadway Trailblazer signs with current travel time information. This system also feeds information directly into the Utah CommuterLink website to allow motorists access to information before their trips begin.
Nine Trailblazer signs placed on the roadside include a hybrid display that combines a static message with a dynamic insert that incorporates real-time data. The small size of the sign allows for placement in areas with little or no need for the acquisition of right of way. Motorists are directed to take the least congested routes - either I-15 or US 89 - which leads to a reduction in delays, stops, emissions and the number and severity of traffic incidents.

An accelerated schedule of six months for design, construction and software development allowed the Trailblazer project to come to fruition in time to provide a positive impact for the remainder of I-15 CORE construction and into the future.

According to UDOT, the Trailblazer signs are unique as they compare local road travel times versus freeway travel times. Other signs like these in Utah show freeway travel times only. This system does not just provide an immediate benefit to traffic management during the I-15 CORE project: the installations will be left in place once construction has been completed, becoming a legacy product to enhance regional mobility.
UTC

Related Content

  • August 21, 2017
    New Hampshire plans for tomorrow’s communication
    Someone once likened predicting the future to ‘nailing a jelly to the wall’. With ITS, C-ITS and V2X technology progressing at such a pace, predicting the future is more akin to trying to nail three jellies to the wall – but only having one nail. And yet with roadways having a lifetime measured in decades, that is exactly what highway engineers and traffic planners are expected to do. Fortunately, New Hampshire DoT (NHDoT) believes its technological advances may be able to provide a solution. The Central Ne
  • October 29, 2012
    Project to ease traffic on Interstate 80 unveiled
    California’s regional transportation officials are taking a comprehensive approach to relieving clogged arteries that affect the health of commuters and cities along a 22-mile stretch of the Interstate 80 corridor from the Carquinez Bridge to the MacArthur Maze.
  • May 31, 2013
    Temporary traffic monitoring with Bluetooth and wi-fi
    David Crawford reviews developments in temporary ITS. Widespread take-up of technologies such as Bluetooth and wi-fi are encouraging the emergence of more sophisticated, while still cost effective, ITS responses to the traffic issues posed by temporary road situations such as work zones and special events. Andy Graham of traffic solutions specialists White Willow Consulting says: “A machine-to-machine radio link is far easier and cheaper than reading characters on a plate.” There can be other plusses. Tech
  • June 19, 2012
    First phase of Houston reversible HOV to HOT lanes completed
    Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilization of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135kms