Skip to main content

Innovative traffic information system

From the roadside James Foster compiles some eye-catching news, deployments and product picks from the work zone
January 31, 2012 Read time: 3 mins
"We put a high emphasis on minimising the inconvenience to the travelling public"

From the roadside James Foster compiles some eye-catching news, deployments and product picks from the work zone

1904 Utah Department of Transportation (UDOT) and contractor, Provo River Constructors (Fluor, Ames Construction, 1905 Ralph L. Wadsworth Construction, Wadsworth Brothers Construction joint venture), partnered with 139 Transcore to develop an innovative approach to provide real-time arterial traffic information during the I-15 Corridor Expansion (I-15 CORE) and minimise traffic delays for local motorists. The system extends the concept and success of freeway management travel time systems to the arterial roadways during construction.

UDOT began a US$1.725 billion project last April, the largest roadway project in the state's history, to widen and rebuild some 39km of I-15 in Utah County nearly 50km south of Salt Lake City. The I-15 CORE project is currently 30 per cent complete and on schedule for its December 2012 deadline. The project is an important investment to restore aging infrastructure, address long-term transportation needs, and improve the movement of goods and services throughout the state in one of the state's fastest-growing counties.

Because the project will span more than two years and there is no other freeway system in the county apart from I-15, the project leaders knew there would be significant effects on traffic on the local streets.
Eric Rasband, UDOT I-15 CORE traffic and maintenance of traffic manager: "We put a high emphasis on minimising the inconvenience to the travelling public. Under a competitive bidding environment, our contractor, PRC, looked for an opportunity to improve mobility on local roads throughout construction as a value-add in their overall traffic management proposal. PRC asked 139 Transcore to design and construct a traffic management system that extends the concept and success of freeway management travel time systems to the arterial roadways during construction and one that will continue to help drivers make informed choices when the freeway reconstruction is complete."

The travel time application designed by TransCore includes the installation of a monitoring system along US 89 and connector routes to I-15, which uses anonymous vehicle data obtained from 119 Sensys Networks travel time detectors. This data is used to measure actual traffic flow conditions. The information is then fed directly to TransCore's TransSuite software to automatically update roadway Trailblazer signs with current travel time information. This system also feeds information directly into the Utah CommuterLink website to allow motorists access to information before their trips begin.
Nine Trailblazer signs placed on the roadside include a hybrid display that combines a static message with a dynamic insert that incorporates real-time data. The small size of the sign allows for placement in areas with little or no need for the acquisition of right of way. Motorists are directed to take the least congested routes - either I-15 or US 89 - which leads to a reduction in delays, stops, emissions and the number and severity of traffic incidents.

An accelerated schedule of six months for design, construction and software development allowed the Trailblazer project to come to fruition in time to provide a positive impact for the remainder of I-15 CORE construction and into the future.

According to UDOT, the Trailblazer signs are unique as they compare local road travel times versus freeway travel times. Other signs like these in Utah show freeway travel times only. This system does not just provide an immediate benefit to traffic management during the I-15 CORE project: the installations will be left in place once construction has been completed, becoming a legacy product to enhance regional mobility.

Related Content

  • Gearing up for IntelliDrive cooperative traffic management
    February 1, 2012
    Beginning in the first quarter of 2010 it became evident that the IntelliDrivesm programme direction had been reestablished, by the USDOT's ITS Joint Program Office (JPO), after being adrift for a few years. The programme was now moving toward a deployment future and with a much broader stakeholder involvement than it had exhibited previously. By today not only is it evident that the programme was reestablished with a renewed emphasis on deployment, it is also apparent that it is moving along at a faster pa
  • Troopers in the TOC – a recipe for success
    May 11, 2016
    A traffic incident management project in Arizona has speeded up reopening closed lanes and saved an estimated $165m through reducing traffic delays. The process for clearing roadway incidents on the Maricopa County freeways in Arizona has always reflected industry best practice with, for instance, a live feed of freeway cameras to the Arizona Department of Public Safety’s (DPS) dispatch centre and the City of Phoenix Fire dispatch centre. The region has nearly 480km (300 miles) of freeway connecting 27 citi
  • Next Generation 911, updating the US 911 emergency system
    February 1, 2012
    Continuing developments in telecommunications and public expectation have left the US's legacy, analogue 911 emergency call system trailing. Linda D. Dodge, Public Safety Program Manager for the ITS programme in USDOT's Research and Innovative Technology Administration, the sponsor of the Next Generation 911 initiative, writes about efforts towards updating
  • Is the US economic stimulus programme working?
    January 30, 2012
    In this third installment in a series of articles exploring the impact of the US economic stimulus programme on the ITS industry, Pete Goldin reports on the ongoing debate in Congress about American Recovery and Reinvestment Act. A debate continues to rage in the US Congress and in the media about the effectiveness of the American Recovery and Reinvestment Act of 2009 (ARRA), and especially the timeliness of the ARRA payments. Some of the arguments seem somewhat partisan in origin while others point out fla