Skip to main content

Work begins on major southern Vietnam bridge

Construction has begun on two-kilometre bridge spanning the Tien River in the Mekong Delta in southern Vietnam. The investment of US$145 million is funded by non-refundable aid from the Australian government, a loan from the Asia Development Bank and Vietnamese government capital. The cable-stayed Cao Lanh Bridge, which links Cao Lanh Town and Lap Vo District in Dong Thap Province, will have four lanes for motorised vehicles to run at a speed of 80 kilometres per hour and two other lanes for non-motoris
October 25, 2013 Read time: 2 mins
Construction has begun on two-kilometre bridge spanning the Tien River in the Mekong 33 Delta in southern Vietnam.  The investment of US$145 million is funded by non-refundable aid from the Australian government, a loan from the 6849 Asia development Bank and Vietnamese government capital.

The cable-stayed Cao Lanh Bridge, which links Cao Lanh Town and Lap Vo District in Dong Thap Province, will have four lanes for motorised vehicles to run at a speed of 80 kilometres per hour and two other lanes for non-motorised vehicles.  Once completed in 2017, the bridge is expected to be used by 170,000 people a day.

The Cao Lanh Bridge is the single largest Australian aid activity on mainland Southeast Asia. It is one of three infrastructure projects that make up the broader Central Mekong Delta Connectivity Project, comprising two high cable-stayed bridges with a combined length of five kilometres and an additional 25 kilometres of connecting roads.

“The Cao Lanh Bridge will directly benefit the lives of five million Vietnamese in the Delta by stimulating private sector investment and local industry, boosting Vietnam’s exports, and improving access to social and health services,” Senator Brett Mason, Australia's Parliamentary Secretary to the Minister for Foreign Affairs, said at the groundbreaking ceremony.

For more information on companies in this article

Related Content

  • First VMS installed on Gateway WA project
    August 19, 2015
    Australian signs manufacturer, A.D. Engineering International was selected by DownerMouchel to provide overhead variable message signs for the Gateway WA project, which aims to improve the safety and efficiency of one of Western Australia’s most important transport hubs around Perth airport. Gateway WA was selected as the alliance partner by Main Roads Western Australia to deliver the $1 billion Gateway WA Perth Airport and Freight Access Project on behalf of the Australian and Western Australian Governm
  • ITS Australia welcomes APC and ACCC statements on ITS
    August 13, 2014
    Recent statements by the Australian Productivity Commission and the Australian Competition and Consumer Commission encouraging the exploration of intelligent transport systems (ITS) technologies to tackle transport challenges have been warmly welcomed by ITS Australia.
  • WhereIsMyTransport maps out urban future
    September 17, 2020
    Tech start-up says it will be emerging world's 'citymapper' by 2023
  • CTS enters partnership to improve Melbourne’s traffic flow
    June 18, 2018
    Cubic Transportation Systems (CTS) has entered an R&D agreement with the iMove Cooperative Research Centre to improve traffic flows in Melbourne, Australia. The $55m government-funded project will consider the interaction of all transport modes to identify blockages in the management of an integrated multi-modal system. The two-year initiative - called the Implementation of a Multimodal Situational Awareness and Operations Regime Evaluation Platform – sees CTS collaborating with the University of Melbou