Skip to main content

Work begins on major southern Vietnam bridge

Construction has begun on two-kilometre bridge spanning the Tien River in the Mekong Delta in southern Vietnam. The investment of US$145 million is funded by non-refundable aid from the Australian government, a loan from the Asia Development Bank and Vietnamese government capital. The cable-stayed Cao Lanh Bridge, which links Cao Lanh Town and Lap Vo District in Dong Thap Province, will have four lanes for motorised vehicles to run at a speed of 80 kilometres per hour and two other lanes for non-motoris
October 25, 2013 Read time: 2 mins
Construction has begun on two-kilometre bridge spanning the Tien River in the Mekong 33 Delta in southern Vietnam.  The investment of US$145 million is funded by non-refundable aid from the Australian government, a loan from the 6849 Asia development Bank and Vietnamese government capital.

The cable-stayed Cao Lanh Bridge, which links Cao Lanh Town and Lap Vo District in Dong Thap Province, will have four lanes for motorised vehicles to run at a speed of 80 kilometres per hour and two other lanes for non-motorised vehicles.  Once completed in 2017, the bridge is expected to be used by 170,000 people a day.

The Cao Lanh Bridge is the single largest Australian aid activity on mainland Southeast Asia. It is one of three infrastructure projects that make up the broader Central Mekong Delta Connectivity Project, comprising two high cable-stayed bridges with a combined length of five kilometres and an additional 25 kilometres of connecting roads.

“The Cao Lanh Bridge will directly benefit the lives of five million Vietnamese in the Delta by stimulating private sector investment and local industry, boosting Vietnam’s exports, and improving access to social and health services,” Senator Brett Mason, Australia's Parliamentary Secretary to the Minister for Foreign Affairs, said at the groundbreaking ceremony.

For more information on companies in this article

Related Content

  • Brazil tenders interstate bus concession in Goiás
    April 10, 2014
    Brazil's national ground transport agency ANTT has launched a four-lot tender budgeted at US$2.55 billion to operate an interstate bus system in and around the nation's capital for 15 years. The public-private partnership involves interconnecting eleven municipalities in the mid-western state of Goiás to several of the federal district's administrative regions. The entire network is comprised of 551 bus lines in 33 sectors that transport some 90 million passengers per year, ANTT says. The tender stip
  • Progressing work zone safety systems
    February 1, 2012
    David Crawford investigates progress in a key safety area - work zones. Highway construction zone safety is taken seriously enough in the US to merit a special spring National Work Zone Awareness Week, which in 2010 ran from 19-23 April. Headed by the US Department of Transportation's Federal Highway Administration (FHWA), this aims to reduce an annual toll of work zone deaths - 720 in 2008 (an average of one every 10 hours) with more than 40,000 traffic injuries (an average of one every 13 minutes).
  • Progressing work zone safety systems
    February 6, 2012
    David Crawford investigates progress in a key safety area - work zones
  • Report highlights ways to make roads safer for pedestrians
    November 23, 2012
    A report released by the International Transport Forum (ITF) at the OECD highlights the role of national governments in improving pedestrian mobility and proposes twelve measures to create safer walking environments. The study, entitled Pedestrian Safety, Urban Space and Health, was prepared by a working group of transport experts and urban planners from nineteen countries and the World Health Organisation under the leadership of the ITF. The report comes to a number of conclusions, including the fact that