Skip to main content

Thales joins Cairo metro pyramid scheme

Company will provide communications and ticketing for line connecting Giza with Cairo
By Adam Hill July 6, 2022 Read time: 2 mins
The new metro will connect Cairo with the pyramids at Giza (© Onefivenine | Dreamstime.com)

Thales is to provide telecommunications, centralised control and ticketing systems for a new metro line in Egypt.

The Egyptian National Authority for Tunnels has tasked Thales, in partnership with Orascom Construction and Colas Rail, to work on Cairo Metro Line 4 Phase 1, which will be 42km long with 35 stations.

Building the 19km first phase is expected to take six years, with 16 stations, a depot and an operations control centre. 

It will connect the centre of Greater Cairo to the Giza Pyramid Complex, which is 13km to the south-west of Cairo's centre.

Thales is to supply and install systems including radio, multi-service network, wayside telephone and wireless LAN systems, wayside equipment for security systems, passenger Information and public address and revenue collection solutions. 

Phase 2 of Cairo Metro Line 4 will come later, with additional 23.5 km, 19 stations, and 92 trains.

Thales has already provided the first ticketing system for Cairo Line 1, and the communication systems and ticketing for Line 2 and 3.

The new line is part of an ambitious infrastructure plan and will cross Cairo from east to west, and - in addition to easing congestion - is expected to be heavily used by tourists, as it will provide a connection with the pyramids site and the future Grand Egyptian Museum.

“This new Line 4 will significantly improve the density of people in one of the most congested city of Egypt," says Benoît Couture, VP for integrated communications and supervision activities.

Indra is involved in another of Cairo's transit projects, a monorail.

For more information on companies in this article

Related Content

  • Opening the closed-loop to realise ITS benefits
    April 8, 2014
    Jim Leslie, manager of ITS applications engineering at the Econolite Group looks at practical steps in transitioning from closed-loop masters to a centralised ATMS. Not many years ago the standard method of coordinating signalised intersections in local areas was to install an on-street master – each of which monitored and controlled a limited number of signal controllers or intersections as a closed-loop system. And, to a certain extent, each closed-loop system was autonomous from others deployed by the ag
  • Indra to upgrade Algeria’s Bouïra tunnel
    September 2, 2015
    The National Road Agency of Algeria (ANA) has awarded a contract for the modernisation of the Bouïra tunnel to a consortium comprising of the state construction company Cosider TP and Indra. The contract, which is worth US$12.3 million to Indra, will run for 15 months. It will deliver an integrated management solution and intelligent traffic systems for the tunnel, which is located on the east-west highway and crosses the country from the border with Tunisia to the border with Morocco and sees the heavi
  • Bytemark offers mobility rewards programme
    October 22, 2021
    The programme supports the SDoT's 'Flip Your Trip' campaign
  • Pöyry consortium to implement Finnish light rail project
    June 23, 2015
    The City of Tampere has awarded Tralli, a consortium of Pöyry, VR Track and YIT, a contract worth approximately USS$281 million to carry out the light rail project in Tampere, Finland. The 23.5 kilometre light rail system will be constructed in the busiest part of the Tampere public transport system, from the city centre to Sampola, with 23 to 25 stops. The development phase of the project will begin in July 2015, with Pöyry and VR Track jointly responsible for all engineering, both in the develop