Skip to main content

Thales joins Cairo metro pyramid scheme

Company will provide communications and ticketing for line connecting Giza with Cairo
By Adam Hill July 6, 2022 Read time: 2 mins
The new metro will connect Cairo with the pyramids at Giza (© Onefivenine | Dreamstime.com)

Thales is to provide telecommunications, centralised control and ticketing systems for a new metro line in Egypt.

The Egyptian National Authority for Tunnels has tasked Thales, in partnership with Orascom Construction and Colas Rail, to work on Cairo Metro Line 4 Phase 1, which will be 42km long with 35 stations.

Building the 19km first phase is expected to take six years, with 16 stations, a depot and an operations control centre. 

It will connect the centre of Greater Cairo to the Giza Pyramid Complex, which is 13km to the south-west of Cairo's centre.

Thales is to supply and install systems including radio, multi-service network, wayside telephone and wireless LAN systems, wayside equipment for security systems, passenger Information and public address and revenue collection solutions. 

Phase 2 of Cairo Metro Line 4 will come later, with additional 23.5 km, 19 stations, and 92 trains.

Thales has already provided the first ticketing system for Cairo Line 1, and the communication systems and ticketing for Line 2 and 3.

The new line is part of an ambitious infrastructure plan and will cross Cairo from east to west, and - in addition to easing congestion - is expected to be heavily used by tourists, as it will provide a connection with the pyramids site and the future Grand Egyptian Museum.

“This new Line 4 will significantly improve the density of people in one of the most congested city of Egypt," says Benoît Couture, VP for integrated communications and supervision activities.

Indra is involved in another of Cairo's transit projects, a monorail.

For more information on companies in this article

Related Content

  • City Tech to provide CTA occupancy insights 
    March 18, 2021
    Microsoft Azure tool will support data creation and analytics activities
  • Thales to deliver signalling system for southern Gotthard extension
    September 19, 2016
    Following completion of the Gotthard tunnel, AlpTransit Gotthard has awarded Thales a US$64 million (€57 million) signalling contract for the new Ceneri tunnel, the final section of the transalpine rail corridor that will link Zurich and Milan in less than three hours journey time. Located 25 km south of the Gotthard tunnel, the Ceneri Base Tunnel between Bellinzona and Lugano in Switzerland is 15.4 km long and, like the Gotthard tunnel, comprises two single-track tubes separated by a space of 40 metres
  • Personal Rapid Transit, clear benefits for European cities
    July 26, 2012
    David Crawford watches the race to get the world's first PRT system up and running. To paraphrase the old joke about buses bunching, you seem to have to wait several decades for a Personal Rapid Transit (PRT) system, and then half a dozen come along together. Currently, in fact, there are well over that number of schemes for driverless electric passenger-carrying 'pod' networks at various stages of planning, design and implementation around the world. Locations range from a straight-off-the-drawing board ne
  • Cubic wins NZ national ticketing deal
    October 25, 2022
    Open loop system will apply to bus, rail and ferry services across New Zealand