Skip to main content

TagMaster wins order from Bombardier for São Paulo Line 5 Project

Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.
July 25, 2012 Read time: 2 mins
RSSSweden-headquartered 177 TagMaster has received an order from 513 Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.

Bombardier’s scope for this project in São Paulo comprises the turnkey design, supply, installation and commissioning of its Cityflo 650 communications-based train control (CBTC) solution for the existing 8.4 km of line with six stations plus the extension of the line by 11.6 km with 11 new stations and a total of 34 trains. The TagMaster RFID Readers will be installed under the trains and provide both primary train location information and accurate positioning information to the Cityflo 650 CBTC train control system. This driverless system will enable trains to circulate in safety with a short, 75-second, headway, therefore maximising the line capacity. The system will also use TagMaster’s field programmable version of the HD Tag, which will enable the Bombardier installation team to programme individual tag location information in the tag to suit the actual mounting position.

For more information on companies in this article

Related Content

  • Cross border enforcement a logical step
    January 30, 2012
    The logic supporting a cross-border enforcement Directive for the European Union (EU) is both detailed and compelling. The White Paper on European transport policy published in 2001 included the ambitious objective of reducing by 50 per cent by 2010 the number of people killed on the roads of the EU. But since 2005 the reduction in the number of road deaths has been slowing down: overall, the period from 2001 until 2009 saw the number of fatalities decrease by 36 per cent. According to Community indicators,
  • GMV applies tech to Israeli light rail project 
    April 23, 2021
    Four-year project includes 160 trains and 76 stations 
  • Siemens to automate railway network in Algiers metropolitan area
    December 23, 2015
    Siemens is to supply the signalling, safety and control systems for the 140 km long-distance rail network in the Algiers metropolitan area. The order will be carried out by Estel RA, a joint venture of state-run Algerian Railways SNTF (Société Nationale des Transports Ferroviaires) and Siemens.
  • Siemens wins communications and control systems contract
    March 18, 2013
    Siemens is to provide the central section communications and control systems for the high-frequency metro service between Whitechapel and Paddington through new tunnels under central London under a contract announced by Crossrail. The scope of works includes the design, testing, installation and commissioning of key communications and control systems within Crossrail’s central section including CCTV and public address systems at stations, customer information displays, staff and emergency services radio sys