Skip to main content

TagMaster wins order from Bombardier for São Paulo Line 5 Project

Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.
July 25, 2012 Read time: 2 mins
RSSSweden-headquartered 177 TagMaster has received an order from 513 Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.

Bombardier’s scope for this project in São Paulo comprises the turnkey design, supply, installation and commissioning of its Cityflo 650 communications-based train control (CBTC) solution for the existing 8.4 km of line with six stations plus the extension of the line by 11.6 km with 11 new stations and a total of 34 trains. The TagMaster RFID Readers will be installed under the trains and provide both primary train location information and accurate positioning information to the Cityflo 650 CBTC train control system. This driverless system will enable trains to circulate in safety with a short, 75-second, headway, therefore maximising the line capacity. The system will also use TagMaster’s field programmable version of the HD Tag, which will enable the Bombardier installation team to programme individual tag location information in the tag to suit the actual mounting position.

For more information on companies in this article

Related Content

  • Travel times halve for tolling converts
    August 5, 2013
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv
  • High Speed 2 should be part of integrated transport policy
    September 13, 2013
    The UK’s Institution of Engineering and Technology (IET) is calling for the High Speed 2 (HS2) proposals to be reassessed to become part of an integrated transport programme of metro, rail, bus and road projects to revitalise the cities of the Midlands and North. The call comes as the Transport Secretary Patrick McLoughlin reasserted the case for the new rail line. Prof Phil Blythe, chair of the IET Transport Policy Panel, said: “We are supportive in principle of high speed rail, but we believe that
  • Sony helps Rio get a better view of the Olympics
    June 29, 2016
    With the Olympics approaching, Sony’s Stephane Clauss examines how the latest camera technologies can help cities cope with the huge crowds attending major events. This August will see more than 10,000 athletes head to Rio de Janeiro for the Olympics Games. Alongside them will be their coaching staff, a hoard of logistics teams, thousands of volunteer marshals (London 2012 had 70,000) and millions of spectators. All such major events have nervous jitters on the way to the opening ceremony. This year has see
  • Thales to upgrade Greater Cairo Metro
    December 18, 2015
    More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment