Skip to main content

SkyTrain signals more work for Thales

Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system
By David Arminas September 29, 2020 Read time: 2 mins
Broadway Subway will extend the existing SkyTrain network (© Jerry Coli | Dreamstime.com)

Thales has been selected to provide its SelTrac communications-based train control (CBTC) signalling technology for the Vancouver Broadway Subway Project.

The Broadway Subway is an extension of the SkyTrain’s Millennium Line, extending it 5.7km along the Broadway Corridor, one of the busiest bus routes in North America.

It will run from VCC-Clark Station to a new station at Arbutus Street. There will be a fully integrated interchange where the existing Canada Line will intersect.

From Arbutus Station, the 99 B-Line bus service will connect passengers to the University of British Columbia. The new line will consist of 700m of elevated track and proceed underground for 5km, with six stations below the Broadway Corridor.

Skytrain’s Expo, Millennium and Canada lines in Vancouver are already equipped with Thales SelTrac technology, along with other projects in Toronto, New York City, Dubai, Doha and Santiago.

Thales is contracted by the Broadway Subway Constructors General Partnership (BSCGP).

British Columbia selected BSCGP to complete the design and construction of the line, which will be operated and maintained by British Columbia Rapid Transit.

Construction of the Broadway Subway Project is expected to start before then end of this year and is scheduled for public opening in 2025.

“The Broadway Subway is a key project in the City of Vancouver’s Transportation 2040 strategic plan,” said Dominique Gaiardo, vice president and managing director for Thales’ urban rail signalling business.

“Thales will continue to build local expertise and contribute to the mass transit capacity expansion in Vancouver with the innovative SelTrac CBTC system."

For more information on companies in this article

Related Content

  • ITS America applauds latest TIGER grants
    October 30, 2015
    US Transportation Secretary Anthony Foxx has announced US$500 million in TIGER (Transportation Investment Generating Economic Recovery) 2015 grants for 39 transportation projects in 34 states, some projects spanning several states. In selecting projects, Foxx prioritised the extent to which the proposed project strengthens access to opportunities through transportation improvements.
  • TST awarded signalling contract for shanghai automated metro line
    January 30, 2018
    Shanghai Shentong Metro Group has awarded Thales SEC Transport the signalling contract for the Fully Automated Operation (FAO) Line 14 of the City’s Metro. It will provide an integrated management system as well as signalling and supervision solutions with the intention of meeting the demand for metro transport capacity and alleviating traffic in the downtown area. The driverless and highly automated line is scheduled to enter service at the end of 2020.
  • Keeping people on track is RATP’s raison d’etre
    June 14, 2018
    In Paris, RATP Group’s autonomous Metro Line 1 is carrying 750,000 people a day across the city. Ben Spencer is invited into the control room to take a look at how the system works Paris is visited by millions of tourists each year, keen to see for themselves stunning attractions such as the Eiffel Tower, Arc de Triomphe, Notre-Dame, the Louvre, the Seine and all the rest. But while the best-known sites of the City of Light tend to be on the surface, there is a lot going on below those iconic grand boule
  • Thales transport systems for Santo Domingo metro
    April 2, 2013
    Thales, as a member of the Eurodom consortium, has supplied communication, supervision, signalling and ticketing systems for line 2 of the Santo Domingo Metro in the Dominican Republic. The opening of the metro line, which crosses the city from east to west, is a key milestone in a national plan to improve public transport and relieve congestion on the road network. It connects to the north-south line 1 and once complete, will run for 21 km and will have twenty stations. Fourteen stations are now open and t