Skip to main content

SkyTrain signals more work for Thales

Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system
By David Arminas September 29, 2020 Read time: 2 mins
Broadway Subway will extend the existing SkyTrain network (© Jerry Coli | Dreamstime.com)

Thales has been selected to provide its SelTrac communications-based train control (CBTC) signalling technology for the Vancouver Broadway Subway Project.

The Broadway Subway is an extension of the SkyTrain’s Millennium Line, extending it 5.7km along the Broadway Corridor, one of the busiest bus routes in North America.

It will run from VCC-Clark Station to a new station at Arbutus Street. There will be a fully integrated interchange where the existing Canada Line will intersect.

From Arbutus Station, the 99 B-Line bus service will connect passengers to the University of British Columbia. The new line will consist of 700m of elevated track and proceed underground for 5km, with six stations below the Broadway Corridor.

Skytrain’s Expo, Millennium and Canada lines in Vancouver are already equipped with Thales SelTrac technology, along with other projects in Toronto, New York City, Dubai, Doha and Santiago.

Thales is contracted by the Broadway Subway Constructors General Partnership (BSCGP).

British Columbia selected BSCGP to complete the design and construction of the line, which will be operated and maintained by British Columbia Rapid Transit.

Construction of the Broadway Subway Project is expected to start before then end of this year and is scheduled for public opening in 2025.

“The Broadway Subway is a key project in the City of Vancouver’s Transportation 2040 strategic plan,” said Dominique Gaiardo, vice president and managing director for Thales’ urban rail signalling business.

“Thales will continue to build local expertise and contribute to the mass transit capacity expansion in Vancouver with the innovative SelTrac CBTC system."

Related Content

  • March 27, 2012
    Thales awarded first metro signalling contract in Brazil
    Thales has been selected by Andrade Gutierrez (AG) and CR Almeida to deliver its SelTrac communications-based train control (CBTC) signalling solution for Line 17 of the São Paulo metro. The new line will be driverless and fully automatic. The first phase of implementation is planned to support the 2014 FIFA World Cup, with completion scheduled for August 2014, a record delivery time of just 27 months. The new 18km elevated line will be built by a consortium led by Andrade Gutierrez (AG) and including CR Al
  • September 5, 2013
    Thales scoops Hong Kong signalling contract
    Thales has been awarded a contract by Hong Kong’s metro operator, MTR Corporation, to provide signalling technology for Shatin to Central Link Phase 1 segment of the Hong Kong metro using a communications-based train control (CBTC) system. To provide fully automatic train operation the contract includes the modernisation of the Ma On Shan Line and West Rail Line lines, where Thales previously installed its CBTC solution in 2003/04.
  • December 13, 2013
    CAF-Thales consortium wins Chile metro contract
    In a contract worth US$451.9 million, a consortium of CAF and Thales will supply Santiago’s metro operator with CAF trains controlled by Thales’ communication based train control (CBTC) system for lines 3 and 6 of the metro. The contract also includes a 20-year maintenance agreement. Thales will supply its fully automatic Seltrac CBTC solution, enabling the metro operator to increase the frequency of train services and passenger capacity. This is boosted by CAF’s new energy efficient rail cars, which of
  • November 24, 2016
    Metro Vancouver launches major transit and transportation investment
    Metro Vancouver, Canada, is to implement Phase One of its 10-Year Vision for Metro Vancouver Transit and Transportation, following the approval of a US$1.5 billion (CAD$2 billion) plan in transit and road improvements, marking the beginning of a multi-year investment in transit and transportation across the region. Transit and transportation improvements to be delivered during Phase One will include: increases in bus, rail and the HandyDART services; pre-construction and consultation on Broadway subway a