Skip to main content

SkyTrain signals more work for Thales

Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system
By David Arminas September 29, 2020 Read time: 2 mins
Broadway Subway will extend the existing SkyTrain network (© Jerry Coli | Dreamstime.com)

Thales has been selected to provide its SelTrac communications-based train control (CBTC) signalling technology for the Vancouver Broadway Subway Project.

The Broadway Subway is an extension of the SkyTrain’s Millennium Line, extending it 5.7km along the Broadway Corridor, one of the busiest bus routes in North America.

It will run from VCC-Clark Station to a new station at Arbutus Street. There will be a fully integrated interchange where the existing Canada Line will intersect.

From Arbutus Station, the 99 B-Line bus service will connect passengers to the University of British Columbia. The new line will consist of 700m of elevated track and proceed underground for 5km, with six stations below the Broadway Corridor.

Skytrain’s Expo, Millennium and Canada lines in Vancouver are already equipped with Thales SelTrac technology, along with other projects in Toronto, New York City, Dubai, Doha and Santiago.

Thales is contracted by the Broadway Subway Constructors General Partnership (BSCGP).

British Columbia selected BSCGP to complete the design and construction of the line, which will be operated and maintained by British Columbia Rapid Transit.

Construction of the Broadway Subway Project is expected to start before then end of this year and is scheduled for public opening in 2025.

“The Broadway Subway is a key project in the City of Vancouver’s Transportation 2040 strategic plan,” said Dominique Gaiardo, vice president and managing director for Thales’ urban rail signalling business.

“Thales will continue to build local expertise and contribute to the mass transit capacity expansion in Vancouver with the innovative SelTrac CBTC system."

For more information on companies in this article

Related Content

  • OCTA seeks proposals from three teams for I-405 freeway project
    March 31, 2016
    The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
  • Vinci wins contract for light railway project in Qatar
    April 18, 2012
    QDVC, a joint venture between Qatari Diar and French group Vinci has won the contract for the new phase of work in the light railway development in the Qatari town of Lusail near Doha. The contract, worth US$536.67 mllion, and covers civil engineering work on eight underground stations, the construction of a viaduct crossing a motorway and preliminary work on a light rail transport depot and maintenance workshop. The project is expected to take 38 months to complete.
  • Thales awarded two ticketing deals in Egypt
    June 16, 2017
    Thales has signed two new fare collection contracts covering 19 new stations on the Cairo metro.
  • Oklahoma interstates and highways designated as Alternative Fuel Corridors
    November 22, 2016
    The Oklahoma Federal Highway Administration has designated the I-35, I-40 and I-44 highways as alternative fuel corridors, a special designation aimed at improving the mobility of passenger and commercial vehicles that run on alternative fuels. This new designation means special highway signage indicating the nearest alternative fuelling station will eventually be placed along these highways by the Oklahoma Department of Transportation. The federal Fixing America’s Surface Transportation Act directed th