Skip to main content

SkyTrain signals more work for Thales

Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system
By David Arminas September 29, 2020 Read time: 2 mins
Broadway Subway will extend the existing SkyTrain network (© Jerry Coli | Dreamstime.com)

Thales has been selected to provide its SelTrac communications-based train control (CBTC) signalling technology for the Vancouver Broadway Subway Project.

The Broadway Subway is an extension of the SkyTrain’s Millennium Line, extending it 5.7km along the Broadway Corridor, one of the busiest bus routes in North America.

It will run from VCC-Clark Station to a new station at Arbutus Street. There will be a fully integrated interchange where the existing Canada Line will intersect.

From Arbutus Station, the 99 B-Line bus service will connect passengers to the University of British Columbia. The new line will consist of 700m of elevated track and proceed underground for 5km, with six stations below the Broadway Corridor.

Skytrain’s Expo, Millennium and Canada lines in Vancouver are already equipped with Thales SelTrac technology, along with other projects in Toronto, New York City, Dubai, Doha and Santiago.

Thales is contracted by the Broadway Subway Constructors General Partnership (BSCGP).

British Columbia selected BSCGP to complete the design and construction of the line, which will be operated and maintained by British Columbia Rapid Transit.

Construction of the Broadway Subway Project is expected to start before then end of this year and is scheduled for public opening in 2025.

“The Broadway Subway is a key project in the City of Vancouver’s Transportation 2040 strategic plan,” said Dominique Gaiardo, vice president and managing director for Thales’ urban rail signalling business.

“Thales will continue to build local expertise and contribute to the mass transit capacity expansion in Vancouver with the innovative SelTrac CBTC system."

For more information on companies in this article

Related Content

  • Alstom consortium wins Spanish rail signalling contract
    April 25, 2014
    An Alstom-led consortium which includes Bombardier and Indra has been awarded a contract worth US$567.5 million by the Spanish infrastructure manager ADIF to supply its European Train Control System (ERTMS) Level 2 signalling system, together with maintenance for a period of 20 years for Spain’s new north-west high speed line.
  • 3M reflect on why CAVs need lines and signs
    May 10, 2017
    Tammy Meehan and Thomas Hedblom of 3M consider the ongoing development of technology needed to introduce connected and autonomous vehicles. The transportation industry is in the midst of the most dramatic shift since Henry Ford introduced horseless carriages. Already we are seeing the increased use of advanced driver assistance systems (ADAS) which, along with the introduction of autonomous vehicles in the next few decades, will bring profound changes to vehicles and the environment in which they operate.
  • RBF Consulting selected for ‘hot spots’ feasibility analysis
    April 17, 2012
    RBF Consulting has been selected by the Los Angeles County Metropolitan Transportation Authority to provide transportation planning and engineering for the Measure R funded I-605 Congestion ‘Hot Spots’ Feasibility Analysis. Hot spots are identified as major traffic congestion areas, attributed to increasing passenger car and truck traffic, localised capacity and/or operational constraints on the freeway, or arterial street system.
  • WSP/Parsons Brinckerhoff shortlisted for two prestigious industry awards
    September 14, 2016
    WSP/ Parsons Brinckerhoff has been shortlisted for two Australian Engineering Excellence Awards for work on the Capital Metro Light Rail in Canberra and the North Strathfield Rail Underpass (NSRU) in Sydney. The Capital Metro Light Rail project involves creating a 12 kilometre light rail line in Canberra city’s north. The company provided planning and environment services, which included preparing the largest, most complex Environment Impact Statement in the history of the territory. The NSRU proje