Skip to main content

SkyTrain signals more work for Thales

Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system
By David Arminas September 29, 2020 Read time: 2 mins
Broadway Subway will extend the existing SkyTrain network (© Jerry Coli | Dreamstime.com)

Thales has been selected to provide its SelTrac communications-based train control (CBTC) signalling technology for the Vancouver Broadway Subway Project.

The Broadway Subway is an extension of the SkyTrain’s Millennium Line, extending it 5.7km along the Broadway Corridor, one of the busiest bus routes in North America.

It will run from VCC-Clark Station to a new station at Arbutus Street. There will be a fully integrated interchange where the existing Canada Line will intersect.

From Arbutus Station, the 99 B-Line bus service will connect passengers to the University of British Columbia. The new line will consist of 700m of elevated track and proceed underground for 5km, with six stations below the Broadway Corridor.

Skytrain’s Expo, Millennium and Canada lines in Vancouver are already equipped with Thales SelTrac technology, along with other projects in Toronto, New York City, Dubai, Doha and Santiago.

Thales is contracted by the Broadway Subway Constructors General Partnership (BSCGP).

British Columbia selected BSCGP to complete the design and construction of the line, which will be operated and maintained by British Columbia Rapid Transit.

Construction of the Broadway Subway Project is expected to start before then end of this year and is scheduled for public opening in 2025.

“The Broadway Subway is a key project in the City of Vancouver’s Transportation 2040 strategic plan,” said Dominique Gaiardo, vice president and managing director for Thales’ urban rail signalling business.

“Thales will continue to build local expertise and contribute to the mass transit capacity expansion in Vancouver with the innovative SelTrac CBTC system."

For more information on companies in this article

Related Content

  • Canada’s DRT chooses Init fleet management
    May 1, 2013
    ITS solutions provider Init is to install an inter-modal fleet management system for Canada’s Durham Region Transit (DRT), Toronto. DRT has a fixed route fleet of 205 vehicles which includes twenty-six Pulse Bus Rapid Transit (BRT) vehicles. Init is to replace DRT’s existing scheduling software and will also supply onboard computers, touchscreen driver terminals, planning software, statistics and reporting software and onboard passenger information displays and announcements. Init will also install automat
  • Russia looks to ITS to curb congestion and reduce accidents
    May 7, 2015
    Major ITS installations are planned as the Russian capital Moscow grapples with extensive traffic problems. At the end of 2014, Russia’s first complex intelligent transport system (ITS) started easing traffic problems in and around the capital Moscow, following the implementation of the plans by the federal government and the city’s authorities.
  • Speed limits: is 20 really plenty?
    June 16, 2020
    Speed kills – which means cutting speed should cut collisions. But is it that simple?
  • Dubai RTA signs BeemCar ‘sky pod’ deal
    March 6, 2020
    Dubai’s Roads and Transport Authority (RTA) has its sights set on higher things than cars.