Skip to main content

SkyTrain signals more work for Thales

Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system
By David Arminas September 29, 2020 Read time: 2 mins
Broadway Subway will extend the existing SkyTrain network (© Jerry Coli | Dreamstime.com)

Thales has been selected to provide its SelTrac communications-based train control (CBTC) signalling technology for the Vancouver Broadway Subway Project.

The Broadway Subway is an extension of the SkyTrain’s Millennium Line, extending it 5.7km along the Broadway Corridor, one of the busiest bus routes in North America.

It will run from VCC-Clark Station to a new station at Arbutus Street. There will be a fully integrated interchange where the existing Canada Line will intersect.

From Arbutus Station, the 99 B-Line bus service will connect passengers to the University of British Columbia. The new line will consist of 700m of elevated track and proceed underground for 5km, with six stations below the Broadway Corridor.

Skytrain’s Expo, Millennium and Canada lines in Vancouver are already equipped with Thales SelTrac technology, along with other projects in Toronto, New York City, Dubai, Doha and Santiago.

Thales is contracted by the Broadway Subway Constructors General Partnership (BSCGP).

British Columbia selected BSCGP to complete the design and construction of the line, which will be operated and maintained by British Columbia Rapid Transit.

Construction of the Broadway Subway Project is expected to start before then end of this year and is scheduled for public opening in 2025.

“The Broadway Subway is a key project in the City of Vancouver’s Transportation 2040 strategic plan,” said Dominique Gaiardo, vice president and managing director for Thales’ urban rail signalling business.

“Thales will continue to build local expertise and contribute to the mass transit capacity expansion in Vancouver with the innovative SelTrac CBTC system."

For more information on companies in this article

Related Content

  • Emissions reductions targets to have major impact on transport
    October 28, 2015
    As bold moves aimed at reducing greenhouse gas emissions have been introduced in California, David Crawford looks at the ramifications for transportation. California Governor Jerry Brown’s recent dramatic raising of the bar on emissions reduction policy for the state has won him praise from Japan, Australia, Europe and the secretariat of the critical UN conference on climate change being held in Paris in November/December 2015. His April 2015 executive order aimed at bringing emissions to 40% below 1990 lev
  • Priority boosts ridership and cuts congestion
    May 4, 2016
    Transit priority is proving a win-win in Europe and Australia. David Crawford reports. Technology that integrates with the Australian-originated Sydney Coordinated Adaptive Traffic System (SCATS) is driving bus signal priority and performance analysis initiatives on both sides of the world; in its homeland, with a major deployment in 2015, and in the capital of the Republic of Ireland.
  • Canadian authorities convinced of enforcement safety benefits
    November 28, 2012
    Cost-benefit analysis invariably finds highly in favour of speed and red light enforcement, particularly so in Edmonton in the Alberta province of Canada, where authorities need no convincing of the merits of road safety engineering. Justification of enforcement efforts on economic grounds has been reinforced this year, by a study of the costs and benefits of red light enforcement. New York-based economic research firm John Dunham & Associates carried out this latest analysis for American Traffic Solutions
  • Varying acceptance of tolling in Africa
    January 6, 2016
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.