Skip to main content

Siemens, Thales land Spanish train deal

Spanish administrator of railway infrastructures, Adif, has awarded the Thales/Siemens joint venture a contract for the installation of traffic control, automatic train protection, telecommunications and safety technologies on the Olmedo-Ourense high-speed line section, together with maintenance over a 20-year period. The amount of the contract is US$637 million. Thales is to install the European Railway Traffic Management System (ERTMS) Level 2 automatic train protection system, wayside LED light signal
November 25, 2014 Read time: 2 mins
Spanish administrator of railway infrastructures, Adif, has awarded the 596 Thales/189 Siemens joint venture a contract for the installation of traffic control, automatic train protection, telecommunications and safety technologies on the Olmedo-Ourense high-speed line section, together with maintenance over a 20-year period. The amount of the contract is US$637 million.

Thales is to install the European Railway Traffic Management System (ERTMS) Level 2 automatic train protection system, wayside LED light signals, axle counters for safe train detection, wheel sensors and landline telecommunications systems. Thales will also install new state-of-the-art electronic interlockings at several stations on the Medina del Campo-Zamora-Ourense conventional line affected by the work on the high-speed line.

The company will also provide all GSM-R mobile communications systems, power supply for the facilities, auxiliary detection systems, equipment buildings and auxiliary building work.

Siemens will install its safety solution based on electronic interlockings and associated technologies, with the ASFA system, centralised traffic control, supply of balises, track circuits, video surveillance systems and access control.

ERTMS level 2 will allow a maximum speed of 350 km/h on this 331 kilometre stretch of the railway, reducing the journey to two hours. In 2018, it will provide a high-speed railway link between Ourense in Galicia and Olmedo near Valladolid.

Related Content

  • Indra implements traffic and toll management on India’s motorways
    October 24, 2012
    Spanish technology provider, Indra, has been awarded contracts valued at US$13.1 million to supply traffic and toll management technology for Indian motorways. Indian infrastructure company GMR has awarded the company three contracts to implement its toll technology on the motorways of the Andhra Pradesh, Karnataka, Rajastan and Gujarat states.
  • Indra to upgrade Algeria’s Bouïra tunnel
    September 2, 2015
    The National Road Agency of Algeria (ANA) has awarded a contract for the modernisation of the Bouïra tunnel to a consortium comprising of the state construction company Cosider TP and Indra. The contract, which is worth US$12.3 million to Indra, will run for 15 months. It will deliver an integrated management solution and intelligent traffic systems for the tunnel, which is located on the east-west highway and crosses the country from the border with Tunisia to the border with Morocco and sees the heavi
  • Kapsch highlights new projects at Middle East Rail exhibition
    January 29, 2014
    Kapsch CarrierCom will take advantage of its presence at Middle East Rail, the region's largest rail exhibition and conference from 4 to 5 February in Dubai to highlight its new all in-one cab radio for locomotives, designed for simplified deployment and offering a feature set which supports new, value-added applications and an option to activate a fully Arabic user interface. The company will also provide detailed information about new projects in the region, where it is to provide GSM-R technology for
  • Thales to upgrade Greater Cairo Metro
    December 18, 2015
    More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment