Skip to main content

Siemens, Thales land Spanish train deal

Spanish administrator of railway infrastructures, Adif, has awarded the Thales/Siemens joint venture a contract for the installation of traffic control, automatic train protection, telecommunications and safety technologies on the Olmedo-Ourense high-speed line section, together with maintenance over a 20-year period. The amount of the contract is US$637 million. Thales is to install the European Railway Traffic Management System (ERTMS) Level 2 automatic train protection system, wayside LED light signal
November 25, 2014 Read time: 2 mins
Spanish administrator of railway infrastructures, Adif, has awarded the 596 Thales/189 Siemens joint venture a contract for the installation of traffic control, automatic train protection, telecommunications and safety technologies on the Olmedo-Ourense high-speed line section, together with maintenance over a 20-year period. The amount of the contract is US$637 million.

Thales is to install the European Railway Traffic Management System (ERTMS) Level 2 automatic train protection system, wayside LED light signals, axle counters for safe train detection, wheel sensors and landline telecommunications systems. Thales will also install new state-of-the-art electronic interlockings at several stations on the Medina del Campo-Zamora-Ourense conventional line affected by the work on the high-speed line.

The company will also provide all GSM-R mobile communications systems, power supply for the facilities, auxiliary detection systems, equipment buildings and auxiliary building work.

Siemens will install its safety solution based on electronic interlockings and associated technologies, with the ASFA system, centralised traffic control, supply of balises, track circuits, video surveillance systems and access control.

ERTMS level 2 will allow a maximum speed of 350 km/h on this 331 kilometre stretch of the railway, reducing the journey to two hours. In 2018, it will provide a high-speed railway link between Ourense in Galicia and Olmedo near Valladolid.

Related Content

  • September 19, 2016
    Thales to deliver signalling system for southern Gotthard extension
    Following completion of the Gotthard tunnel, AlpTransit Gotthard has awarded Thales a US$64 million (€57 million) signalling contract for the new Ceneri tunnel, the final section of the transalpine rail corridor that will link Zurich and Milan in less than three hours journey time. Located 25 km south of the Gotthard tunnel, the Ceneri Base Tunnel between Bellinzona and Lugano in Switzerland is 15.4 km long and, like the Gotthard tunnel, comprises two single-track tubes separated by a space of 40 metres
  • April 2, 2012
    Kapsch equips high speed line in Spain with latest train communication technology
    Kapsch CarrierCom has successfully implemented the latest train security and communication technology on the first high speed line in the Galicia region in the North West of Spain. The route between Orense and Santiago covers 87 km of tracks with 29 km of tunnels through a very mountainous area. Kapsch has been the Base Station Subsystem (BSS) GSM-R system turnkey supplier including network design, network integration and optimisation to the project. The company has also supplied all site infrastructure req
  • December 18, 2024
    Huawei opens door to new opportunities in transport & logistics
    By addressing the four key elements of a transportation network’s composition with a state-of-the-art digital solution, Huawei is bringing significant performance uplifts to all aspects of railway operations
  • January 9, 2013
    High speed rail signalling system contract win for Hollysys
    In a contract valued at around US$10.75 million, Chinese provider of automation and control technologies, Hollysys Automation Technologies, is to supply the ground-based signalling system for the 357 km Guangdong section of the Xiamen-Shenzhen high-speed rail line which has a designed travelling speed of 200 km/h. Hollysys will provide the ground-based high-speed rail signaling system, including train control centres (TCC), line-side electronic units (LEU) and other auxiliary equipments, which are expected