Skip to main content

PB designing fibre network for MDOT

The Michigan Department of Transportation (MDOT) has awarded a contract to Parsons Brinckerhoff (PB) for the design of a new fibre-optic communications network in metropolitan Detroit. The project is a multi-phase effort to build an MDOT-owned fibre-optic network for communications with the Detroit region’s intelligent transportation system deployment, including hundreds of closed-circuit television cameras, dynamic message signs and vehicle detection systems along regional freeways.
April 19, 2012 Read time: 2 mins
RSSThe 1688 Michigan Department of Transportation (MDOT) has awarded a contract to 4983 Parsons Brinckerhoff (PB) for the design of a new fibre-optic communications network in metropolitan Detroit. The project is a multi-phase effort to build an MDOT-owned fibre-optic network for communications with the Detroit region’s intelligent transportation system deployment, including hundreds of closed-circuit television cameras, dynamic message signs and vehicle detection systems along regional freeways. The system will link all of the existing network hubs and nodes, eliminating the need for existing leased communications services, and upgrading the existing wireless radio communications to high-bandwidth fibre-optic links for most of the field devices and remote network nodes. The project encompasses the full extent of the Detroit-area freeway system, including over 160kms of instrumented roadway.

As the prime consultant, PB is responsible for the overall design of the communications network. Its services will entail preparation of a design report and network migration plan, with recommendations for how to best phase roll-out of the system; development of conduit installation plans for dozens of miles of regional freeways; and design of fibre-optic plans, including cable routing, network sizing, splice points, and fibre allocation details.  The design will include a minimum of two phases, with the first phase focusing on elimination of an existing leased fibre-optic service, and the second phase focusing on network redundancy and reduction of wireless linkages.

Construction of Phase 1 will commence in July 2013, with completion slated for late 2014.

For more information on companies in this article

Related Content

  • Oregon debuts road user charging to fund transportation projects
    March 5, 2015
    Sanef ITS and connected car company Intelligent Mechatronic Systems (IMS) have been awarded a road usage charge contract by the Oregon Department of Transportation (ODOT). Debuting on Oregon's roadways in July 2015, this voluntary distance-based road usage charging program is said to be North America's first implementation of a mileage-based charging solution. Diminishing fuel tax returns led Oregon decision-makers to look for a fair, reliable source of revenue to fund transportation projects for the state.
  • Oregon debuts road user charging to fund transportation projects
    March 5, 2015
    Sanef ITS and connected car company Intelligent Mechatronic Systems (IMS) have been awarded a road usage charge contract by the Oregon Department of Transportation (ODOT). Debuting on Oregon's roadways in July 2015, this voluntary distance-based road usage charging program is said to be North America's first implementation of a mileage-based charging solution. Diminishing fuel tax returns led Oregon decision-makers to look for a fair, reliable source of revenue to fund transportation projects for the state.
  • Mixed results for public-private traffic management partnerships
    January 25, 2012
    David Crawford looks at the somewhat patchy success to date of trying to involve the private sector in operating traffic management centres
  • Strategic road deals across India
    April 17, 2012
    A series of key highway projects will help transform India’s internal links as well as its connections to neighbouring nations. A new US$1.2 billion highway in India running through Ahmedabad-Udaipur-Kishangarh through the states of Gujarat and Rajasthan is attracting strong interest. So far 11 bids have been made including offers from a consortium comprising Belford-GVK, Soma-Isolux, Vince-Hindustan Construction, IRB Infrastructure (IRB)-Reliance Infra and Plus-Nagarjuna Construction. Other bidders include