Skip to main content

Kapsch equips high speed line in Spain with latest train communication technology

Kapsch CarrierCom has successfully implemented the latest train security and communication technology on the first high speed line in the Galicia region in the North West of Spain. The route between Orense and Santiago covers 87 km of tracks with 29 km of tunnels through a very mountainous area. Kapsch has been the Base Station Subsystem (BSS) GSM-R system turnkey supplier including network design, network integration and optimisation to the project. The company has also supplied all site infrastructure req
April 2, 2012 Read time: 2 mins
RSS81 Kapsch CarrierCom has successfully implemented the latest train security and communication technology on the first high speed line in the Galicia region in the North West of Spain. The route between Orense and Santiago covers 87 km of tracks with 29 km of tunnels through a very mountainous area.

Kapsch has been the Base Station Subsystem (BSS) GSM-R system turnkey supplier including network design, network integration and optimisation to the project. The company has also supplied all site infrastructure required for the GSM-R network and for public operators to be able to provide indoor coverage to the train passengers. Apart from all site engineering, the installation included all related civil and power works, construction of towers and masts, as well as radio frequency equipment and aerials. Along the track, Kapsch has installed two Base Station Controllers (BSC) and TransCoder Units (TCU), 25 GSM-R Base Transceiver Stations (BTS) and 87 optical GSM-R repeaters. All site infrastructures are related to 30 BTS sites and 29 masts for GSM-R and public operator’s repeaters.

Related Content

  • July 25, 2012
    TagMaster wins order from Bombardier for São Paulo Line 5 Project
    Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.
  • December 17, 2012
    Kapsch to maintain UK rail GSM-R network
    Austrian rail telecommunication systems integrator Kapsch CarrierCom has been awarded the contract to maintain the entire GSM-R (Global System for Mobile Communications – Railway) network on behalf of British railway infrastructure operator Network Rail. The multi-year agreement will see Kapsch supporting Network Rail’s control centre team to ensure the highest levels of network availability, enabling higher frequency of train services and greater safety standards. GSM-R is an international wireless communi
  • August 10, 2016
    Interoperability facilitates mobility on Santiago’s toll roads
    Drivers crossing Chile’s capital are benefitting from additional investment in ITS. Mauro Nogarin reports. Santiago de Chile is pioneering the development of concession-interoperable, multi-lane, free-flow urban highways. This road network crosses the city from north to south (Autopista Central), from east to west (Costanera Norte) and also includes the north-western (Vespucio Norte) and southern (Vespucio Sur) ring roads surrounding this metropolitan area of seven million people.
  • January 10, 2014
    The sunshine subsidy for Colorado’s tollways
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in