Skip to main content

Hungary’s $159m AV test track gears up

Construction of the Zalazone project started in 2017 and is on schedule
By David Arminas June 1, 2020 Read time: 1 min
Hungary's AV track will contain a city zone (© Thodonal | Dreamstime.com)

The second phase of Hungary’s 265-hectare autonomous vehicle (AV) Zalazone test track is nearing completion, according to the country’s minister of innovation.

Laszlo Palkovics said the $159 million project, which started in 2017, is on schedule and progressing in three phases. 

The track is near Zalaegerszeg, around 180km south-west of Budapest.

Phase one involved setting up basic elements such a braking platform, a vehicle handling course and a typical country road layout. 

The braking platform is designed to carry out ABS, ATC and ESP tests along eight types of surfaces and watering systems and also allows for high-speed platooning tests.

Phase one also saw the start of the smart city area to provide realistic traffic circumstances in a closed area.

The second phase, now nearing completion, includes a high-speed oval, bad roads and slopes and additional aspects of the smart city.

Phase three will be development from 2022 onwards, according to the organisation’s website. 

It will add more more types of lanes, surfaces and road geometry, with different types of building and facades placed next to the street grid.

Budapest University of Technology, University of Pannonia and Széchenyi Istvány University do much of their vehicular and transportation research at Zalazone.
 

Related Content

  • Rapid growth of bus rapid transit schemes on US Pacific coast
    January 27, 2012
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals
  • Amazon 'in talks to buy' AV start-up Zoox
    May 27, 2020
    Any such deal would move online giant into driverless world
  • Michigan fosters real-world testing of workzone ITS
    September 19, 2017
    Turning a ‘problem’ into ‘an opportunity’ is the mantra of just about every business book and Michigan Department of Transportation (MDoT) looks set to achieve that aim in Oakland County, where 29km (18 miles) of the I-75 needs to be reconstructed. Running north-northwest from Detroit, the I-75 carries around 170,000 vehicles per day but, being built in the 1970s, it now requires an additional lane in each direction and upgrading to the latest design and safety standards. Upgrading will be carried out in
  • Wallbox thinks small with Quasar
    October 13, 2020
    UK's Electric Nation V2G trial is recruiting Nissan EV owners using CrowdCharge app