Skip to main content

High speed surfing in France and Italy

Two announcements on the same day – from the OCEA Consortium and from Andrew Solutions - have reported overcoming the challenges of internet access in high-speed trains travelling at over 200mph (320km/h) in France and Italy. The technological achievements realised by the consortium have risen to the challenge of ensuring service at high speed in a high voltage electrical environment, and integrating the system's maintenance into the overall maintenance schedules of a high-speed network with no impact on th
May 18, 2012 Read time: 2 mins
Two announcements on the same day – from the OCEA Consortium and from Andrew Solutions - have reported overcoming the challenges of internet access in high-speed trains travelling at over 200mph (320km/h) in France and Italy.

The technological achievements realised by the consortium have risen to the challenge of ensuring service at high speed in a high voltage electrical environment, and integrating the system's maintenance into the overall maintenance schedules of a high-speed network with no impact on the rotation of trains.

"Providing Internet connectivity at 320 km/h was a new challenge that we are all proud to have successfully addressed for the SNCF," commented Philippe Roger of 5636 Orange Business Services.
Meanwhile, 1983 Telecom Italia called on Andrew Solutions’ 950 CommScope division to provide its equipment, commissioning services, and expertise in support of 2G and 3G wireless networks on 5637 Trenitalia Frecciarossa high speed trains. The Frecciarossa high speed train line is the fastest in Trenitalia’s fleet, with speeds reaching between 300-350 kilometers per hour.

As part of the new coverage and capacity project led by Telecom Italia, Andrew’s in-train solution is extending reliable wireless signals to passengers and staff on all 60 Frecciarossa trains. High speed trains’ metalised windows can dramatically reduce signal penetration into the carriages, resulting in spotty coverage and an increase of dropped calls. The pure speed of high speed trains complicates the hand off of wireless signals between base stations. And the complexities of different terrain and rapidly changing outdoor signal levels of the various networks involved increase the complexity.

Andrew’s wireless coverage solution is helping produce elongated cells that reduce the number of handovers required while boosting signal strength within the handover region. The company supplied about 600 Node AM dual band digital repeaters and kilometres of Radiax radiating cable with connectors and accessories, in addition to helping design and commission the wireless coverage system. An Andrew Node AM repeater, pickup antenna for GSM 900 MHz/UMTS 2100 MHz/GPS frequency bands, and metres of Radiax are installed in each Frecciarossa train carriage.

For more information on companies in this article

Related Content

  • The Asia-Pacific poses a multitude of ITS challenges
    May 30, 2014
    The Asia-Pacific ITS Forum and Exhibition in Auckland, New Zealand, provided a focus for the region’s ITS Associations. Mary Bell reports. In late April, ITS New Zealand hosted the 13th Asia-Pacific ITS Forum and Exhibition in Auckland. Around 350 delegates from 24 nations gathered to share and advance ITS applications on both strategic and technical levels and to discuss the differing and various challenges faced in the region.
  • Wireless video interface for automated traffic tolling
    July 16, 2014
    Canadian video interface supplier Pleora Technologies has unveiled the world’s first embedded hardware solution for delivering real-time video over a standard IEEE 802.11 wireless link. With Pleora's iPORT NTx-W embedded video interface, designers can quickly and easily integrate high-speed wireless connectivity into imaging systems where video cabling creates complexity, cost, and usability challenges. The device streams uncompressed video with low, consistent latency at sustained throughputs of more t
  • US States use technology and smart solutions to battle winter weather
    December 18, 2013
    US state Departments of Transportation (DOTs) are gearing up to meet the challenge of maintaining a high level of service during the winter without the benefit of additional financial resources. High-tech solutions like GPS guidance systems and low-tech products like potato juice are helping states to cut costs, improve efficiency, and minimise environmental impacts. The Alaska Department of Transportation and Public Facilities uses a variety of advanced technologies to combat extreme winter weather and
  • Rail industry, regulators debate feasibility of PTC
    March 10, 2014
    US rail industry officials and federal accident regulators have disagreed about the viability of a looming mandate that most US railways be equipped with automated control systems by the end of next year. Congress is requiring that most major railroad companies install automated systems known as positive train control (PTC) by December 2015. Automated train systems have gained renewed attention after a spate of high-profile accidents on passenger and freight railways, including most recently a Decem