Skip to main content

Cellular coverage on trains to get boost

According to Ingo Flomer, director of Product Management of UK company Axell Wireless, UK transport secretary Patrick McLoughlin’s intention to upgrade the rail network to enable passengers to access high-speed mobile broadband does not go far enough to promote an integrated communications infrastructure that supports cellular (3G and 4G) coverage on-board trains. Flomer says the UK has significant technological hurdles to overcome to connect rail passengers to the cellular network. The coverage would ha
October 2, 2013 Read time: 2 mins
According to Ingo Flomer, director of Product Management of UK company 7510 Axell Wireless, UK transport secretary Patrick McLoughlin’s intention to upgrade the rail network to enable passengers to access high-speed mobile broadband does not go far enough to promote an integrated communications infrastructure that supports cellular (3G and 4G) coverage on-board trains.

Flomer says the UK has significant technological hurdles to overcome to connect rail passengers to the cellular network. The coverage would have to extend throughout the entire 14,480 kilometres of UK passenger and freight network, along with the notorious black spots found in cuttings and tunnels. UK rail operators, along with 5021 Network Rail, can overcome the particular logistical problems of installing cellular networks across such an extensive area.

There are also significant technical issues posed by modern train rolling stock. Radio frequency (RF) signals generally glance off the outside of multi-layered, metallic carriages, which results in a reduced level of RF signal propagation inside carriages and therefore, poor quality mobile coverage.

A distributed antenna system (DAS) enhances mobile phone reception in enclosed spaces such as train carriages or tunnels/metros, taking the signal either from a mobile operator’s base station or from an off-air repeater and amplifies it in hard to reach places such as tunnels.

For train operators, providing their passengers with a good cellular coverage on-board trains acts as a differentiator in a very competitive marketplace. They systems they choose to deploy should prepare them for coping with future technologies such as 4G, without having to replace equipment later down the line.

For more information on companies in this article

Related Content

  • WCCTV tower wins type-approval
    July 4, 2012
    UK-headquartered mobile surveillance solutions manufacturer WCCTV has announced that its Tower product has been granted Type Approval status for use on UK railway infrastructure by Network Rail. The Tower, the only equipment of its kind to win type approval, is a complete al-in-one surveillance system which has been designed to operate at trackside. It is non-conductive and can be quickly and easily installed. The system can be self-powering for up to eight weeks and provides live video from a heavy duty c
  • Mitsubishi consortium receives letter of conditional acceptance for Doha Metro
    February 23, 2015
    A consortium of Mitsubishi Heavy Industries, Mitsubishi Corporation; Hitachi, The Kinki Sharyo and Thales has received a Letter of Conditional Acceptance from the Qatar Railways Company (Qatar Rail) for a systems package for the Doha Metro, the first metro system to be constructed in the State of Qatar. It is said to be one of the world’s largest projects for a single metro system. Construction is scheduled for completion by October 2019. Qatar Rail is the owner and manager of Qatar’s rail network and respo
  • Two seconds – the difference between life and death
    October 17, 2016
    Professor Donald Fisher has spent 15 years identifying factors that increase the crash risk of novice and older drivers. His findings highlight the difference between living and dying, Colin Sowman reports.
  • Victorian government to implement high capacity signalling on new rail line
    July 18, 2017
    The Victorian government, Australia has awarded CPB Contractors and Bombardier Transportation the contract to deliver the US$790 million (AU$1 billion) Rail Systems Alliance in Melbourne, which includes the roll-out of a 55 kilometre long high capacity signalling (HCS) and communications system. HCS allows trains to safely run closer together, meaning they can run more often. The technology will enable trains every two to three minutes, creating a ‘turn-up-and-go’ train network for Melbourne. The signalling