Skip to main content

Cellular coverage on trains to get boost

According to Ingo Flomer, director of Product Management of UK company Axell Wireless, UK transport secretary Patrick McLoughlin’s intention to upgrade the rail network to enable passengers to access high-speed mobile broadband does not go far enough to promote an integrated communications infrastructure that supports cellular (3G and 4G) coverage on-board trains. Flomer says the UK has significant technological hurdles to overcome to connect rail passengers to the cellular network. The coverage would ha
October 2, 2013 Read time: 2 mins
According to Ingo Flomer, director of Product Management of UK company 7510 Axell Wireless, UK transport secretary Patrick McLoughlin’s intention to upgrade the rail network to enable passengers to access high-speed mobile broadband does not go far enough to promote an integrated communications infrastructure that supports cellular (3G and 4G) coverage on-board trains.

Flomer says the UK has significant technological hurdles to overcome to connect rail passengers to the cellular network. The coverage would have to extend throughout the entire 14,480 kilometres of UK passenger and freight network, along with the notorious black spots found in cuttings and tunnels. UK rail operators, along with 5021 Network Rail, can overcome the particular logistical problems of installing cellular networks across such an extensive area.

There are also significant technical issues posed by modern train rolling stock. Radio frequency (RF) signals generally glance off the outside of multi-layered, metallic carriages, which results in a reduced level of RF signal propagation inside carriages and therefore, poor quality mobile coverage.

A distributed antenna system (DAS) enhances mobile phone reception in enclosed spaces such as train carriages or tunnels/metros, taking the signal either from a mobile operator’s base station or from an off-air repeater and amplifies it in hard to reach places such as tunnels.

For train operators, providing their passengers with a good cellular coverage on-board trains acts as a differentiator in a very competitive marketplace. They systems they choose to deploy should prepare them for coping with future technologies such as 4G, without having to replace equipment later down the line.

For more information on companies in this article

Related Content

  • Dubai plans major transportation projects
    September 25, 2014
    According to Mattar Al Tayer, chairman and executive director of Dubai’s Roads and Transport Authority (RTA), the authority is planning at least another 35 mega projects in the future after spending about US$19.8 billion so far in upgrading services in the city. Speaking at InnoTrans 2014 in Berlin, Al Tayer said work was progressing on projects related to Expo 2020. He said these would include the extension of the Red Line of the Dubai Metro, upgrading roads and junctions surrounding and leading to t
  • London’s strategy to tackle air quality problems
    October 21, 2014
    Colin Sowman talks to Matthew Pencharz, the man charged with charting London’s path between catering for traveller needs, conserving ancient buildings and conforming to modern air quality standards.
  • Traffic monitoring and hard shoulder running
    March 1, 2013
    Hard shoulder running is on the increase – and the detection and monitoring of incidents on affected roads is occupying the minds of experts across Europe and the US
  • Report highlights community impact of new mobility options
    March 29, 2018
    Local authorities and communities must understand the impacts of the new mobility options and regulate to get the transport systems they want, according to a new report. Colin Sowman takes a look. Outside of the big cities plagued with congestion, the existing transportation system(s) often cope adequately, and the ongoing workload (maintenance, safety…) is more than enough to keep local transport authorities busy. Is it, therefore, a good use of public service employees’ time to keep abreast of the raft