Skip to main content

Berlin introduces wirelessly-charged electric bus Line

Berlin has become the first capital city to introduce a wirelessly charged electric bus, as part of a project funded by Federal Ministry of Transport and Digital Infrastructure. The Berlin Transport Authority, Berliner Verkehrsbetriebe (BVG) has introduced four Solaris Urbino 12 electric buses equipped with the Bombardier Primove inductive charging system and traction equipment from Vossloh Kiepe. The buses now operate on the 6.1 kilometre line 204 between Südkreuz and Zoologischer Garten (Hertzallee). Vos
September 4, 2015 Read time: 2 mins

Berlin has become the first capital city to introduce a wirelessly charged electric bus, as part of a project funded by Federal Ministry of Transport and Digital Infrastructure.
The Berlin Transport Authority, Berliner Verkehrsbetriebe (7580 BVG) has introduced four Solaris Urbino 12 electric buses equipped with the Bombardier Primove inductive charging system and traction equipment from Vossloh Kiepe.

The buses now operate on the 6.1 kilometre line 204 between Südkreuz and Zoologischer Garten (Hertzallee). Vossloh Kiepe’s electric drive ensures the vehicles are not only emission-free, but also produce low vibration and noise, benefitting both passengers and the environment.

Each bus will be charged wirelessly and contactlessly via 513 Bombardier’s inductive Primove technology which enables the buses to recharge in just a few minutes.

Bombardier claims that the Primove battery system, with a total capacity of 90 kilowatt hours, offers sufficient energy reserves to handle even Berlin’s most demanding routes. In addition, the wireless charging system is well shielded so that the electromagnetic radiation is lower than that of a conventional induction cooker. To fully charge the batteries overnight and air condition the passenger compartment before starting operation, four stationary and one mobile charging station were also installed by Vossloh Kiepe at the BVG depot. There the buses are supplied with power via charging cables.

Like all BVG’s electric powered vehicles, the new Solaris Urbino 12 electric buses are powered exclusively with green electricity. BVG says that within one year, the four electric buses on the line 204 will travel a total of approximately 200,000 kilometres, saving 260 tons of CO2 emissions.

For more information on companies in this article

Related Content

  • Spanish city to test 200 EVs
    May 9, 2013
    The Spanish city of Malaga is to participate in the four-year Zem2All project to study the impact that the use of electric vehicles (EVs) have on the city. During the tests an in-depth study of the impact of EVs on the electricity grid will be carried out and the conditions for a widespread use of electric cars will be analysed. Researchers say results should provide information on the impact and management of e-mobility resources in cities of the future, ranging from the use of cars, charging infrastructur
  • Volvo launches ElectriCity bus project in Sweden
    June 18, 2013
    Buses that glide noiselessly without emissions, that pick up passengers indoors and which are powered by a renewable source of electricity – this will become a reality in 2015, if a new initiative in the Swedish city of Gothenburg is successful. Behind the initiative, known as ElectriCity, is the Volvo Group, in cooperation with the Swedish Energy Agency, the City of Gothenburg, Västtrafik, Lindholmen Science Park and Johanneberg Science Park. The aim is to make buses powered entirely by electricity from r
  • Bombardier wins UK order for 130 Electrostar cars
    March 23, 2012
    Bombardier Transportation yesterday announced that it has secured an additional order, valued at US$296 million, for 130 Electrostar cars for Southern rail in the UK. The new trains, which will augment the operator’s existing fleet of Bombardier’s electric multiple units, will be manufactured in the UK with initial production commencing in the latter half of 2012.
  • Cost benefit analysis ‘can’t be carried out with a cookbook’
    June 25, 2018
    There is far more to working out the worth of a project than simply filling in a few headings on a spreadsheet. David Crawford surveys some recent thinking from the US and Canada. Cost benefit analysis (CBA) “can’t be carried out with a cookbook”, warns US analyst Professor Robert J Brent. “ You can’t just get out a spreadsheet and fill in the data for all the headings. Each transport CBA should have something that is distinctive, in terms of location (for example, for a rural area), types of user