Skip to main content

Alstom and Huawei complete first LTE 4G pilot for metros

Alstom and Huawei have successfully completed a pilot project to develop a Long Term Evolution (LTE) 4G multi-service broadband radio networking technology for metros. The project was launched in the frame of a Memorandum of Understanding in April 2014, under which Huawei supplied the LTE network and Alstom which provided the train set and onboard signalling equipment. Alstom claims to be the first rail manufacturer to integrate LTE 4G in its signalling solution. LTE technology enables a single wirele
July 6, 2015 Read time: 2 mins
8158 Alstom and 6787 Huawei have successfully completed a pilot project to develop a Long Term Evolution (LTE) 4G multi-service broadband radio networking technology for metros.

The project was launched in the frame of a Memorandum of Understanding in April 2014, under which Huawei supplied the LTE network and Alstom which provided the train set and onboard signalling equipment. Alstom claims to be the first rail manufacturer to integrate LTE 4G in its signalling solution.

LTE technology enables a single wireless communication system supporting mission critical voice trunking and video communications, communication-based train control (CBTC) and broadband data applications such as passenger information systems and live streaming of CCTV 1 images. It improves operational services, reinforces security control and enables remote diagnostic of the onboard equipment while reducing operational costs. Alstom has integrated the LTE technology and carried out static and dynamic tests on the metro at its Valenciennes site in France.

For more information on companies in this article

Related Content

  • Austria’s answer to temporary traffic problems
    December 22, 2015
    ASFINAG has developed a mobile traffic monitoring and guidance system through a pre-commercial procurement project. Drivers have become accustomed to roadside and gantry-mounted traffic guidance and control systems along the major roads and main motorway sections. But there are occasions when intense monitoring is required on a temporary basis along motorway sections without traffic guidance and control systems and on federal and national roads too. Examples include the monitoring of the traffic flow during
  • UK unveils 5G-connected tram 
    March 17, 2021
    West Midlands 5G says trams can use on-board sensors to predict and respond to faults
  • Kapsch offers improved cab radios for railway communications
    September 18, 2014
    Kapsch CarrierCom, in partnership with Sierra Wireless, has launched two improved railway cab radios. The RC900 voice and data cab radio and the RD900 data radio are equipped with the latest Sierra Wireless HPRM1radio modules called, which ensure additional robustness against unwanted radio interference and blocking. A stable radio connection is an essential requirement for the railway system. Due to the growing networks of public operators, more and more interference is affecting the communication withi
  • West Midlands pilots the UK’s first MaaS
    November 14, 2017
    Mobility-as-a-Service is being piloted in the UK’s second largest metropolitan area and will shortly be opened to the travelling public. A fully operational Mobility-as-a-Service (MaaS) offering is being piloted in the West Midlands region of the UK. Covering seven local authorities which make up the West Midlands metropolitan area and population of 2.8 million, the service is being provided through a memorandum of understanding (MOU) between Transport for West Midlands (TfWM), Finnish company MaaS Global