Skip to main content

Alstom and Huawei complete first LTE 4G pilot for metros

Alstom and Huawei have successfully completed a pilot project to develop a Long Term Evolution (LTE) 4G multi-service broadband radio networking technology for metros. The project was launched in the frame of a Memorandum of Understanding in April 2014, under which Huawei supplied the LTE network and Alstom which provided the train set and onboard signalling equipment. Alstom claims to be the first rail manufacturer to integrate LTE 4G in its signalling solution. LTE technology enables a single wirele
July 6, 2015 Read time: 2 mins
8158 Alstom and 6787 Huawei have successfully completed a pilot project to develop a Long Term Evolution (LTE) 4G multi-service broadband radio networking technology for metros.

The project was launched in the frame of a Memorandum of Understanding in April 2014, under which Huawei supplied the LTE network and Alstom which provided the train set and onboard signalling equipment. Alstom claims to be the first rail manufacturer to integrate LTE 4G in its signalling solution.

LTE technology enables a single wireless communication system supporting mission critical voice trunking and video communications, communication-based train control (CBTC) and broadband data applications such as passenger information systems and live streaming of CCTV 1 images. It improves operational services, reinforces security control and enables remote diagnostic of the onboard equipment while reducing operational costs. Alstom has integrated the LTE technology and carried out static and dynamic tests on the metro at its Valenciennes site in France.

For more information on companies in this article

Related Content

  • Vital Technology data comms network deployed at Dublin Port Tunnel
    July 13, 2012
    Vital Technology has supplied a data communications network system to Egis Road & Tunnel Operation Ireland (ERTO) for the Dublin Port Tunnel which opened to traffic in 2007 and is the longest urban tunnel in Europe as well as the largest civil engineering project ever undertaken in Ireland. While core components are proving durable, communication systems became subject to early obsolescence and were causing networking problems and unscheduled closures which prompted the upgrade.
  • Kapsch to maintain UK rail GSM-R network
    December 17, 2012
    Austrian rail telecommunication systems integrator Kapsch CarrierCom has been awarded the contract to maintain the entire GSM-R (Global System for Mobile Communications – Railway) network on behalf of British railway infrastructure operator Network Rail. The multi-year agreement will see Kapsch supporting Network Rail’s control centre team to ensure the highest levels of network availability, enabling higher frequency of train services and greater safety standards. GSM-R is an international wireless communi
  • Workzone safety can be economically viable
    October 24, 2014
    David Crawford looks how workzone safety can be ‘economically viable’. Highway maintenance is one of the most dangerous construction industry occupations in Europe. Research from The Netherlands on fatal crashes indicates that the risk facing road workzone operatives is ‘significantly higher’ than that for the general construction workforce. A survey carried out by the Highways Agency, which runs the UK’s motorway and trunk road network, has suggested that 20% of road workers have suffered injuries from pa
  • Alstom to provide VMI services to San Francisco
    January 7, 2019
    Alstom is to supply vendor managed inventory (VMI) services to the San Francisco Municipal Transportation Agency (SFMTA) over three years to help improve passenger safety. The €50 million contract includes two-year exercisable two-year options. The deal serves as an extension to a 2013 agreement. Alstom says VMI has allowed SFTMA to carry out regular and predictive maintenance of its fleet as well as decrease inventory management costs and increase daily average car availability by 20% and mean distan