Skip to main content

Alstom and Huawei complete first LTE 4G pilot for metros

Alstom and Huawei have successfully completed a pilot project to develop a Long Term Evolution (LTE) 4G multi-service broadband radio networking technology for metros. The project was launched in the frame of a Memorandum of Understanding in April 2014, under which Huawei supplied the LTE network and Alstom which provided the train set and onboard signalling equipment. Alstom claims to be the first rail manufacturer to integrate LTE 4G in its signalling solution. LTE technology enables a single wirele
July 6, 2015 Read time: 2 mins
8158 Alstom and 6787 Huawei have successfully completed a pilot project to develop a Long Term Evolution (LTE) 4G multi-service broadband radio networking technology for metros.

The project was launched in the frame of a Memorandum of Understanding in April 2014, under which Huawei supplied the LTE network and Alstom which provided the train set and onboard signalling equipment. Alstom claims to be the first rail manufacturer to integrate LTE 4G in its signalling solution.

LTE technology enables a single wireless communication system supporting mission critical voice trunking and video communications, communication-based train control (CBTC) and broadband data applications such as passenger information systems and live streaming of CCTV 1 images. It improves operational services, reinforces security control and enables remote diagnostic of the onboard equipment while reducing operational costs. Alstom has integrated the LTE technology and carried out static and dynamic tests on the metro at its Valenciennes site in France.

For more information on companies in this article

Related Content

  • Communications hold key to expanding ITS wireless network expansion
    December 21, 2017
    Wireless transmission of data and control information is making smarter traffic management easier and cheaper to install. It has long been known that connectivity is the key to improving traffic management and many cost-benefit studies prove that investment in new technology can be justified in terms of reduced congestion, shorter travel times, improved safety and air quality. However, many authorities’ cap-ex budgets only cover urgent matters, not improvements, making it difficult, if not impossible to
  • Easy upgrade to4G/LTE with low profile antenna
    December 19, 2014
    With a height of 40mm (1.6 inch) the new Sencity Rail MIMO low profile 2G/3G/4G antenna from Humer and Suhner is suited to trains running in tunnels with tight gauges and double-decker trains.
  • 3M reflect on why CAVs need lines and signs
    May 10, 2017
    Tammy Meehan and Thomas Hedblom of 3M consider the ongoing development of technology needed to introduce connected and autonomous vehicles. The transportation industry is in the midst of the most dramatic shift since Henry Ford introduced horseless carriages. Already we are seeing the increased use of advanced driver assistance systems (ADAS) which, along with the introduction of autonomous vehicles in the next few decades, will bring profound changes to vehicles and the environment in which they operate.
  • Multi-operator, multi-mode integrated travel information
    February 1, 2012
    David Crawford looks forward to the completion of Stockholm's JustNu project. End-2010 is the target date for delivery of the final stages of Stockholm public transport authority (PTA) Stockholms Lokaltrafik (SL)'s ambitious JustNu (Right Now) integrated travel information system. Installation began in 2004, and the result will represent a large-scale and highly exportable solution to the need for harmonisation of traveller information in urban regions with multiple transport operators.