Skip to main content

Telvent urban mobility control

Telvent GIT, real-time IT solutions and information provider, is to implement its urban mobility control centre and traffic light installation maintenance service for the city of Castellón de la Plana, Valencia, Spain. The contract includes Telvent’s integrated service management platform, SmartMobility ICM, which will enable coordinated management of all aspects of the city’s urban mobility. Initial focus will be on centralised monitoring of smart traffic infrastructures and traveller information panels, a
December 3, 2012 Read time: 2 mins
134 Telvent GIT, real-time IT solutions and information provider, is to implement its urban mobility control centre and traffic light installation maintenance service for the city of Castellón de la Plana, Valencia, Spain. The contract includes Telvent’s integrated service management platform, SmartMobility ICM, which will enable coordinated management of all aspects of the city’s urban mobility. Initial focus will be on centralised monitoring of smart traffic infrastructures and traveller information panels, allowing local authorities to progressively introduce the city’s other services associated with mobility, including public transportation and parking facilities.

The ICM platform provides control centre operators with advanced management tools, improved communication among administrations, and facilitates coordinated management of road construction, incidents and events, as well as real-time supervision of traffic conditions and short-term situation forecasting.

Information from the system will be integrated into the Castellón de la Plana website, providing users with information on routes and travel times, traffic conditions and details of any existing road network incidents and their potential effects in terms of modifications to public transport.

Telvent will also provide a travel time system, using Bluetooth and wi-fi signals, to provide data on traffic status, vehicle flow, capacity estimation, pattern identification, congestion and incident detection alarms, historical data records and forecasts, analysis of origin/destination matrices and generate reports for traffic operators.

For more information on companies in this article

Related Content

  • USDoT looks at the costs and potential benefits of connected vehicles
    October 26, 2017
    David Crawford looks at latest lessons learned from the trials of connected vehicles in the US. The progress of connected vehicle (CV) technologies takes centre stage among the hot topics highlighted in the September 2017 edition – the first since 2014 – of the ‘ITS Benefits, Costs and Lessons Learned’ survey from the US ITS Joint Program Office (JPO). The organisation is an arm of the US Department of Transportation (USDoT).
  • Transportation hub the centre of sustainable urban development
    November 21, 2012
    A marriage of transit, technology and culture is taking shape in Minneapolis, with ITS systems vital to hopes for a sustainable development centred on a hub of public transportation. Construction started in July this year on ‘The Interchange’ – a station in the Midwest US city of Minneapolis claimed as the most spectacular expression yet of the fast-spreading North American concept of transit-oriented development (TOD). Due for completion in 2014, the Interchange is designed as a multi-modal public transpor
  • Cost benefit: Wichita eases workzone congestion
    July 8, 2019
    Achieving higher diversion rates has helped one Kansas city to make traffic flow more efficient around workzones. David Crawford examines what’s behind a 10:1 benefit-to-cost ratio in Wichita Around 10% of highway congestion in the US results from delays in workzones, leading to an estimated annual loss of $700 million in fuel costs alone. The lack of accessible real-time traffic information to help motorists minimise their inconvenience – particularly at peak times - is a major contributor. One solut
  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.