Skip to main content

Erskine Bridge goes Bluetooth

The Erskine Bridge vehicle safety barrier replacement team introduced what is said to be a UK first in temporary traffic management on major trunk roads projects with the use of Bluetooth technology to monitor journey times and keep drivers updated on potential delays. Working on behalf of Transport Scotland, with Leeds-based Sky High Technology, contractor Highway Barrier Solutions and the Scotland TranServ project team introduced the origin-destination vehicle movement system to establish how long it w
May 12, 2014 Read time: 3 mins
The Erskine Bridge vehicle safety barrier replacement team introduced what is said to be a UK first in temporary traffic management on major trunk roads projects with the use of Bluetooth technology to monitor journey times and keep drivers updated on potential delays.

Working on behalf of 505 Transport Scotland, with Leeds-based 6020 Sky High Technology, contractor Highway Barrier Solutions and the Scotland TranServ project team introduced the origin-destination vehicle movement system to establish how long it was taking drivers to get to the bridge from various approach roads in the area. The technology works by using encrypted Bluetooth codes found in modern cars and in mobile phones. Because the codes are encrypted the system can’t identify individuals.

The information has been used to effect by Traffic Scotland which updates the overhead gantry messaging and keep Scotland’s roads moving from their state-of-the-art control centre in South Queensferry.

Colin Anderson, Scotland TranServ’s project manager for the Erskine Bridge programme said: “We started with a team of workers dotted at various locations taking individual vehicle descriptions and registrations and relaying these to the rest of their team via radio. These vehicles could take various different routes that didn’t take them to the bridge, so it was a bit of a wild goose chase sometimes and quite a costly and frustrating exercise.

“In what is a UK first for temporary traffic management, Sky High’s detailed journey times or delays are relayed to the Traffic Scotland team who update the overhead gantry messages on the four major approaching arteries, update their website and keep broadcasters informed. The information is calculated against normal journey times during free flow. The information has helped drivers to better plan their journeys and keep congestion to a minimum.”

Traffic Scotland’s operator manager Stein Connelly: “Obtaining real-time accurate traffic flow data with journey times has been vital in operating and monitoring the traffic management for these works. The system has also ensured that we have accurate data on journey times and delays to keep the travelling public informed and updated, so they can better plan their journeys to take account of works on the trunk road.”

The project team has worked closely with Sky High to develop the technology for use in this format.  Grant Wilson, director at Sky High Technology’s Scottish Office said: “Having used Bluetooth technology for a number of high profile traffic and pedestrian projects over the last three years, the Erskine Bridge project provided Sky High with the perfect opportunity to provide HBS, Scotland TranServ and Traffic Scotland with an efficient solution using the real-time monitoring capabilities of our system whilst also removing the need for teams of observers on the network.”

Once the project is completed in May 2014, the Bluetooth system will be dismantled, as traffic movement returns to normal.

For more information on companies in this article

Related Content

  • Iteris sees red over US road deaths
    November 26, 2019
    Drivers who run red lights are killing more than two people per day in the US, says an AAA report. James Esquivel of Iteris sets out some practical ways in which this might be stopped
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • ANPR - cost-efficient traffic management, enforcement and more
    January 23, 2012
    Geoff Collins of Vysionics Intelligent Traffic Solutions talks about the near-term prospects of ANPR. The continued absence of a champion for its cause is preventing digital enforcement technology from delivering the true levels of cost-effectiveness of which it is capable, according to Geoff Collins, sales and marketing director of ANPR specialist Vysionics Intelligent Traffic Solutions.
  • Image Sensing Systems premiers integrated radar and Bluetooth sensor
    June 13, 2016
    Image Sensing Systems (ISS) is here at ITS America 2016 San Jose to introduce the RTMS Sx-300 with integrated Bluetooth sensor to its traffic management product line. The device is a powerful tool that agencies can use to better manage traffic. ISS says the combination of the RTMS radar with the robust Bluetooth sensor is the ideal solution for incident detection and providing traffic managers with highly accurate travel time and origin/destination information.