Skip to main content

Delivering a ‘smart’ Amsterdam Central Station

Under a contract awarded by the Netherlands Railways (NS), Royal HaskoningDHV has been measuring the pedestrian flows of Amsterdam Central Station since the beginning of May. The data enables NS to optimise the often complex pedestrian flows at this station, thereby improving comfort and safety of the 250,000 daily visitors of Amsterdam Central Station. Royal HaskoningDHV has implemented a range of technologies that are already in use other stations in the Netherlands, including tracking and counting se
May 26, 2016 Read time: 2 mins
Under a contract awarded by the Netherlands Railways (NS), 6132 Royal HaskoningDHV has been measuring the pedestrian flows of Amsterdam Central Station since the beginning of May. The data enables NS to optimise the often complex pedestrian flows at this station, thereby improving comfort and safety of the 250,000 daily visitors of Amsterdam Central Station.
 
Royal HaskoningDHV has implemented a range of technologies that are already in use other stations in the Netherlands, including tracking and counting sensors at the station’s entrances and exits and wi-fi tracking from mobile devices. These provide data on where flows of pedestrians enter and leave the station and enables their numbers, walking routes, length of stay and  times of day to be measured, as well as how busy the different locations are.

The data gathered is then analysed to inform new measures that improve pedestrian flow around the station. These might include changing the design and layout of the station, relocating public transport gates, deploying station staff differently, or finding the most logical positions for signposting and the best points to offer station and other information.

For more information on companies in this article

Related Content

  • Glasgow’s new Operations Centre has a key role in city’s future
    June 6, 2014
    David Crawford investigates a control centre with a future. Destined to play a central role in keeping the city and its transport running smoothly during the 2014 Commonwealth Games in July, the new Glasgow Operations Centre in Scotland’s largest urban centre formally went live earlier this year. The aim was to dry run its far-reaching integration of previously distinct core systems and familiarise the public with the initial phase of what will be a long-term post-event legacy. The centre brings together, i
  • Running on empty
    May 2, 2018
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • Righter shade of pale
    July 24, 2012
    Jon Tarleton, Quixote Transportation Technologies, Inc., talks about developments in mobile weather information gathering Quixote Transportation Technologies, Inc. (QTT) is promoting the greater use of mobile technologies to provide infill between fixed Road Weather Information System (RWIS) infrastructure. It is, the company says, a means of reducing the expense of providing comprehensive, network-wide coverage, particularly in geographic locations where the sheer number of centreline miles causes cost to
  • Amsterdam Group turn ITS theory into practice
    August 6, 2013
    ASECAP’s Marko Jandrisits discusses the Amsterdam Group’s efforts to bring a sense of order to cooperative ITS deployments. When an issue arises which is deemed to require a technological solution governments and public-sector agencies around the world all too often tread the same sorry path. A decision is made to research and develop said technology to the production-ready stage, the work is done and the technology realised but then the money for deployment runs out and the technology is left on the shelf