Skip to main content

Capita Symonds wins contract extension with UK Highways Agency

Capita Symonds’ Innovations team has secured a contract extension, valued at over US$1.1 million to $11.2 million UK Highways Agency Traffic Information System (HATRIS) contract which will take the project through to the end of March 2012. The HATRIS system, which has been developed and enhanced by Capita Symonds since 2005, is used to monitor and report on vehicle journey times across set routes on the motorway and trunk road network. This enables the Highways Agency and Department for Transport to identif
April 17, 2012 Read time: 2 mins
431 Capita Symonds’ Innovations team has secured a contract extension, valued at over US$1.1 million to $11.2 million 1841 UK Highways Agency Traffic Information System (HATRIS) contract which will take the project through to the end of March 2012.

The HATRIS system, which has been developed and enhanced by Capita Symonds since 2005, is used to monitor and report on vehicle journey times across set routes on the motorway and trunk road network. This enables the Highways Agency and 1837 Department for Transport to identify trends and measure benefits from new schemes.

The system accumulates traffic data from a variety of sources including National Traffic Control Centre and 2216 Trafficmaster cameras. Through the development of complex algorithms in conjunction with the Transport Research Laboratory (491 TRL), the data is processed on a monthly basis to produce the journey time reliability measures across the Highways Agency network. In addition a Journey Time Database is produced and distributed to the Highways Agency, Department for Transport and key contractors.

The contract extension will see a thorough review of the project tasks in conjunction with the Highways Agency to ensure that the project delivers value for money. In addition TRL, who have provided support to the Highways Agency previously on the project, will now act as a sub consultant for Capita Symonds and will continue to play a role in the project throughout the extension period.

For more information on companies in this article

Related Content

  • Rosa Rountree calls for clarity and consistency
    December 16, 2015
    Rosa Rountree campaigns for accurate and consistent figures for the tendering of tolling concessions. If there is one thing about which Rosa Rountree is passionate, it’s numbers. That’s not surprising for a graduate accountant, but it is not only the quarterly accounts that concern the CEO and president of Egis Projects USA.
  • South west’s first smart motorway opens
    January 15, 2014
    The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and
  • New Hampshire plans for tomorrow’s communication
    August 21, 2017
    Someone once likened predicting the future to ‘nailing a jelly to the wall’. With ITS, C-ITS and V2X technology progressing at such a pace, predicting the future is more akin to trying to nail three jellies to the wall – but only having one nail. And yet with roadways having a lifetime measured in decades, that is exactly what highway engineers and traffic planners are expected to do. Fortunately, New Hampshire DoT (NHDoT) believes its technological advances may be able to provide a solution. The Central Ne
  • Manchester extends Metrolink tap and go to trams and buses
    March 4, 2025
    UK city will soon have integrated payment in same way as capital London