Skip to main content

New German cross-industry project to develop 5G vehicle applications

A new consortium, initiated by Ericsson in Germany, aims to create an infrastructure and real application environment on a motorway test track, to carry out tests in vehicle-to-vehicle, vehicle-to-infrastructure, digitisation of the railway infrastructure and other applications using 5G technology. The 30 kilometre test track consists of several construction sections on the 30 kilometre ‘digital test field motorway’ along the A9 motorway and the high speed rail track between Nuremberg and Greding. The in
November 22, 2016 Read time: 2 mins
A new consortium, initiated by 5650 Ericsson in Germany, aims to create an infrastructure and real application environment on a motorway test track, to carry out tests in vehicle-to-vehicle, vehicle-to-infrastructure, digitisation of the railway infrastructure and other applications using 5G technology.

The 30 kilometre test track consists of several construction sections on the 30 kilometre ‘digital test field motorway’ along the A9 motorway and the high speed rail track between Nuremberg and Greding. The infrastructure is already completed in the first partial sections, meaning that live tests can begin immediately.

The project operates within an independent infrastructure and is not dependent on any commercial network, meaning that 5G prototype applications can be installed and tested regularly, in various network configurations, at any time, without restrictions. The dedicated Ericsson 5G mobile network allows live tests of real time applications, even under extreme network loads, and at very high travel speeds. Test conditions, which are hardly ever found in commercially operated live networks, can be created.

Ericsson has received permission from the German Federal Regulatory Agency to use frequencies from the 700-MHz band and will act as a network operator.

Members of the 5G Connected Mobility consortium include Ericsson, BMW Group, Deutsche Bahn, all three German mobile network operators -Deutsche Telekom, Telefónica Deutschland and Vodafone, the TU Dresden 5G Lab Germany, the Federal Highway Research Institute (BASt) and the Federal Regulatory Agency (BNetzA). The Federal Ministry of Transport and Digital Infrastructure and the Bavarian Road Construction Administration support the project.

The project aims to pool the knowledge, perspectives and recommendations gained from this partnership and further develop them with the focus on integration into international 5G standardisation activities.

Within the scope of 5G-ConnectedMobility, the consortium plans to develop use cases of associated vehicle applications, for vehicle-to-vehicle, vehicle-to-infrastructure communication, new methods of traffic information provision in real time and cross-manufacturer traffic control for automated vehicles.

Related Content

  • MIT researchers hack into traffic lights
    August 22, 2014
    With permission from a local road agency, researchers in from the University of Michigan hacked into nearly 100 wirelessly networked traffic lights, highlighting security issues that they say are likely to pervade networked traffic infrastructure around the country. More than 40 states currently use such systems to keep traffic flowing as efficiently as possible, helping to reduce emissions and delays. The team, led by University of Michigan computer scientist J. Alex Halderman, found three major weaknes
  • Integrated weather and traffic data aids winter maintenance
    October 10, 2012
    A US pooled fund study group has developed a system of software aimed at taking the concept of winter maintenance decision support to a new level – a scientific ‘one-stop-shop’ of weather and service performance data. This report is by Charles Chambers and Benjamin Hershey. With advancements in environmental technology come new systems that assist agencies with better management of winter roadway maintenance resources. In the late 1990s the US Federal Highway Administration (FHWA) began work developing a pr
  • Gatso to participate in German average speed pilot
    September 11, 2014
    The idea of average speed enforcement, or section control, in Germany has long been discussed by German authorities following its recommendation in 2009 by the 47th German Traffic Court Day. Interior Minister Boris Pistorius has announced a section control pilot project which is scheduled to be operational in Lower Saxony in spring 2015. Instead measuring speed in the conventional at a single point, section control measures average speed over a longer stretch of road. This method usually results in l
  • EU supports development of better transport connections in Romania
    March 20, 2015
    The EU's TEN-T Programme is to provide funding of almost US$1.06 million for studies on the development of better freight and passenger transport connections between Bucharest's Henri Coanda airport, the main railway lines and the Romanian motorway network. The studies features feasibility, legal and environmental studies and are part of a larger project which covers the construction of a multimodal hub for freight and passenger transport in Bucharest-Ilfov region near the town of Otopeni, at the crossroads