Skip to main content

Parsons Brinckerhoff designing NJ interchange ramps

Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA. The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the Federal Highway Administration (FHWA) in order to move forward to the preliminary and fina
January 30, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA.

The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the 831 Federal Highway Administration (FHWA) in order to move forward to the preliminary and final design phases.

The project is being undertaken by the Port Authority of New York & New Jersey in cooperation with the 7104 New Jersey Department of Transportation, the FHWA and the cities of Elizabeth and Linden.  

The proposal would add two ramps to the existing interchange of I-278 at US route 1 and 9 and would potentially require a new bridge to be constructed over US route 1 and 9 and, with changes in traffic patterns, it is anticipated that some additional roadway improvements would be required along the US Route 1 and 9 corridor and the improved interchange with I-278.

Related Content

  • Weigh in Motion gets smarter
    January 4, 2023
    Weigh in Motion technology is at the forefront of protecting road surfaces and helping enforcement activity – but could it also play a key role in the development of Smart Cities?
  • D'Artagnan to prepare road usage charge demonstration implementation plan for WSTC
    May 6, 2016
    D'Artagnan Consulting has been awarded a contract by the Washington State Transportation Commission (WSTC) to prepare a detailed state-wide road usage charge (RUC) demonstration implementation plan in preparation for a project expected to start in 2017. The company is working with Berk Consulting, WSP/Parsons Brinckerhoff and several DBE firms and the work will entail updating the WSTC body of materials assessing RUC since 2012 that was successfully completed at the direction of the State Legislature.
  • Arup’s vision of urban mobility in 2050
    May 6, 2015
    Arup’s vision of the Future of Highways considers a wide range of factors that will impact on mobility towards the middle of the century. In its consideration of the Future of Highways through to 2050, international consultants Arup has taken a broad and pragmatic view of where society is heading and the effects that will have on the transport requirements. In terms of major drivers it not only cites
  • Bluetooth travel information aids waiting times at US-Mexico border
    August 12, 2014
    With drivers sometimes waiting up to several hours to cross the US-Mexico border, the Texas Department of Transportation (TXDOT) is partnering with the city of El Paso to provide real-time traffic updates so drivers can plan accordingly and avoid long waits. Using Bluetooth and radio-frequency identification (RFID) technology, wait times will be available to motorists and commercial shippers so they can modify travel plans as needed. As Bluetooth devices in passenger vehicles and RFID transponders in com