Skip to main content

Parsons Brinckerhoff designing NJ interchange ramps

Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA. The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the Federal Highway Administration (FHWA) in order to move forward to the preliminary and fina
January 30, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA.

The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the 831 Federal Highway Administration (FHWA) in order to move forward to the preliminary and final design phases.

The project is being undertaken by the Port Authority of New York & New Jersey in cooperation with the 7104 New Jersey Department of Transportation, the FHWA and the cities of Elizabeth and Linden.  

The proposal would add two ramps to the existing interchange of I-278 at US route 1 and 9 and would potentially require a new bridge to be constructed over US route 1 and 9 and, with changes in traffic patterns, it is anticipated that some additional roadway improvements would be required along the US Route 1 and 9 corridor and the improved interchange with I-278.

Related Content

  • Communications for cooperative infrastructures and safety
    February 2, 2012
    Scott Andrews of Cogenia Partners, LLC details the findings of the VII Proof Of Concept work carried out to verify the effectiveness of 5.9GHz-based communication for future US cooperative infrastructures
  • Benefits of traffic light synchronisation
    January 27, 2012
    Alicia Parkway corridor, located in Orange County, California, was part of Phase 1 of an inter-jurisdictional Traffic Light Synchronisation Programme (TLSP) in Orange County designed to increase mobility and overall drive quality while reducing fuel consumption and greenhouse gas emissions. By increasing average speeds and reducing travel times via the reduction in stops, the programme sought to reduce vehicle acceleration and deceleration events along the corridor; these have been identified as the leadin
  • Magway delivers future of transport
    January 18, 2021
    A dramatic shift towards e-commerce and home working, plus the need for sustainable deliveries, means future cities are at a crossroads, says Phill Davies of Magway
  • European trends in environmental monitoring and enforcement
    February 2, 2012
    David Crawford surveys European trends in environmental monitoring and enforcement