Skip to main content

Parsons Brinckerhoff designing NJ interchange ramps

Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA. The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the Federal Highway Administration (FHWA) in order to move forward to the preliminary and fina
January 30, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA.

The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the 831 Federal Highway Administration (FHWA) in order to move forward to the preliminary and final design phases.

The project is being undertaken by the Port Authority of New York & New Jersey in cooperation with the 7104 New Jersey Department of Transportation, the FHWA and the cities of Elizabeth and Linden.  

The proposal would add two ramps to the existing interchange of I-278 at US route 1 and 9 and would potentially require a new bridge to be constructed over US route 1 and 9 and, with changes in traffic patterns, it is anticipated that some additional roadway improvements would be required along the US Route 1 and 9 corridor and the improved interchange with I-278.

Related Content

  • January 27, 2017
    Atlanta’s reversible express lanes project opens
    The I-75 South Metro reversible express lane project In Atlanta, Georgia, US, will open this weekend along almost 21km between Highway 138 and Highway 155 on the new double-lane addition to the I-75 median. The lanes will carry traffic northbound toward downtown Atlanta during the morning rush hour and southbound during midday and peak afternoon and evening traffic. Parsons prepared conceptual design reports for the project, including lane configuration and access studies, as well as the environmental
  • April 23, 2012
    AECOM and PB JV for Los Angeles regional connector
    The Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of AECOM and Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.
  • July 4, 2012
    Meeting the challenges of smartcard fare payment
    David Crawford monitors a growing trend in contactless smartcard ticketing The north east United States has become a hive of activity in the smart fare payment arena. In October 2011, the New York Metropolitan Transportation Authority (MTA) published, as a preliminary to an imminent procurement process, the detailed concept of its New Fare Payment System (NFPS). Based on open payment industry standards, this is designed to be implemented on all MTA bus and subway services operated by New York City Transit (
  • February 6, 2020
    US braces itself for congestion pain
    Mary Scott Nabers, author of Inside the Infrastructure Revolution: A Roadmap for Building America, looks at how different US states are embracing the need for public transport investment