Skip to main content

Parsons Brinckerhoff designing NJ interchange ramps

Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA. The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the Federal Highway Administration (FHWA) in order to move forward to the preliminary and fina
January 30, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA.

The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the 831 Federal Highway Administration (FHWA) in order to move forward to the preliminary and final design phases.

The project is being undertaken by the Port Authority of New York & New Jersey in cooperation with the 7104 New Jersey Department of Transportation, the FHWA and the cities of Elizabeth and Linden.  

The proposal would add two ramps to the existing interchange of I-278 at US route 1 and 9 and would potentially require a new bridge to be constructed over US route 1 and 9 and, with changes in traffic patterns, it is anticipated that some additional roadway improvements would be required along the US Route 1 and 9 corridor and the improved interchange with I-278.

Related Content

  • OCTA seeks proposals from three teams for I-405 freeway project
    March 31, 2016
    The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
  • Intersection management, cooperative infrastructures - what next?
    February 1, 2012
    What do recent vehicle recalls mean for future cooperative infrastructures? Anthony Smith takes a look. As ITS industry stakeholders converge on Amsterdam for the 2010 Cooperative Mobility Showcase, an unprecedentedly wide range of technologies will be on display demonstrating what might be achievable in the future from innovations based on Vehicle-to-Vehicle (V2V) and Vehicle-to-Infrastructure (V2I) communications.
  • US shutdown: transport bore the brunt
    February 20, 2019
    The longest-ever shutdown in US government history may be over – but it has had an impact on transportation infrastructure, says Mary Scott Nabers of Strategic Partnerships The impact of the longest government shutdown in history has spread far beyond government workers and their families. It is difficult to find any business, school, hospital, city, county, college, university or local government organisation that has not suffered as a result of the shutdown. The negative impact on retail establishments
  • Priority for safety and interoperability, need for DSRC
    July 18, 2012
    Justin McNew, Chief Technology Officer, Kapsch TrafficCom Inc., USA offers his opinion of where 5.9GHz DSRC technology will head in the coming years. The debate ranges back and forth over the most suitable technological solution for future tolling and charging in the US. However, the coming trend is common cooperative infrastructure: instrumented roads and vehicles with the capacity to communicate with each other over all manner of safety, mobility and traveller applications, many of which will involve fina