Skip to main content

Parsons Brinckerhoff designing NJ interchange ramps

Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA. The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the Federal Highway Administration (FHWA) in order to move forward to the preliminary and fina
January 30, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA.

The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the 831 Federal Highway Administration (FHWA) in order to move forward to the preliminary and final design phases.

The project is being undertaken by the Port Authority of New York & New Jersey in cooperation with the 7104 New Jersey Department of Transportation, the FHWA and the cities of Elizabeth and Linden.  

The proposal would add two ramps to the existing interchange of I-278 at US route 1 and 9 and would potentially require a new bridge to be constructed over US route 1 and 9 and, with changes in traffic patterns, it is anticipated that some additional roadway improvements would be required along the US Route 1 and 9 corridor and the improved interchange with I-278.

Related Content

  • Land of ITS opportunities
    February 6, 2012
    Geographically, Russia, the largest country in the world, is vast. So too are the opportunities for the global ITS community, which is why ITS Russia has been actively promoting the country and the opportunities that abound there
  • Cooperative infrastructure systems waiting for the go ahead
    February 3, 2012
    Despite much research and technological promise, progress towards cooperative infrastructure system deployment is still slow. Here, Robert Cone and John Miles take a considered look at how and when it might come about. From a systems engineering viewpoint it looks logical and inevitable that vehicles should be communicating between themselves and with the road infrastructure. But seen from a business viewpoint the case is not proven.
  • ITS-NY Announces 2012 Project of the Year Award Winners
    June 13, 2012
    The Intelligent Transportation Society of New York (ITS-NY) has announced the 2012 ITS-NY Project of the Year Winners at its Nineteenth Annual Meeting and Technology Exhibition in Saratoga Springs, NY. “These winning projects feature ITS and technologies at work in New York State to improve traveller mobility and safety, as well as the efficiency of New York State’s transportation system across all modes of travel,” said Dr Isaac Takyi, ITS-NY president. Winning Projects were announced in the following ITS
  • Progressing work zone safety systems
    February 1, 2012
    David Crawford investigates progress in a key safety area - work zones. Highway construction zone safety is taken seriously enough in the US to merit a special spring National Work Zone Awareness Week, which in 2010 ran from 19-23 April. Headed by the US Department of Transportation's Federal Highway Administration (FHWA), this aims to reduce an annual toll of work zone deaths - 720 in 2008 (an average of one every 10 hours) with more than 40,000 traffic injuries (an average of one every 13 minutes).