Skip to main content

Ontario MOT upgrades highway infrastructure data collection

Geo-intelligence and asset integrity solutions provider Fugro has supplied the Ministry of Transportation of Ontario (MTO), Canada, with its automatic road analysers Aran 7000 and Aran 9000 to collect critical highway infrastructure data. MTO uses the systems as complementary parts of their fleet of asset management tools and utilises the data to assess the health of Ontario’s highway network in its efforts to extend the lifespan of its road network and infrastructure. The Aran 7000 is a fully port
December 14, 2016 Read time: 2 mins
Geo-intelligence and asset integrity solutions provider Fugro has supplied the Ministry of Transportation of Ontario (MTO), Canada, with its automatic road analysers Aran 7000 and Aran 9000 to collect critical highway infrastructure data.

MTO uses the systems as complementary parts of their fleet of asset management tools and utilises the data to assess the health of Ontario’s highway network in its efforts to extend the lifespan of its road network and infrastructure.  

The Aran 7000 is a fully portable road profiling solution for roughness, smoothness, rutting and texture measurement while the Aran 9000 is a fully integrated data collection system equipped with lasers, cameras and accelerometers to measure a road’s profile and to provide an inventory of road assets. The devices enable the Ministry to obtain continuous and improved infrastructure data on highways and roadways, where conducting a manual survey is time consuming and unsafe for staff.

As technology has evolved, MTO’s ability to measure conditions accurately has increased and currently it is updating existing paving contracts to include a requirement for automated data collection. Pavement smoothness is of high importance for MTO and the travelling public. Each time a contractor completes a construction, resurfacing, or rehabilitation project, they are required to use an inertial profiler to measure the surface quality using the International Roughness Index (IRI).

According to Jason Wade, pavement evaluation supervisor for MTO, combining pavement data collection activities using the Aran 9000 and 7000enables them to provide the most cost effective and appropriate solution, in the right place and at the right time. The two platforms provide seamless data integration into MTO’s Vision and iVision specialist software and web application systems. This allows MTO to make well informed decisions on pavement performance and rehabilitation.

Related Content

  • Weigh in motion technology aids overweight vehicle reduction
    March 16, 2012
    Innovative use of truck weighing technology is growing as strategies aimed at reducing numbers of overweight vehicles gather momentum. Business is generally good at present in the truck weighing sector in general, and weigh-in-motion (WIM) technology in particular, according to leading suppliers of systems serving to help reduce overloading. Strategies aimed at deterring excessive truck loading – cutting damage to road networks and risks to safety – vary considerably worldwide, with some governments draggin
  • Cubic: predictive analytics is putting fortune tellers out of business
    November 23, 2018
    The rise of machine learning and artificial intelligence means that fortune tellers will soon be out of business. Ed Chavis takes a behind the scenes look at the world of predictive analytics ver since organisations started taking advantage of insights derived from Big Data, data scientists concentrated their efforts on the ability to make correct assumptions about the future. A few years later, with the help of automation, developments in machine learning (ML) and advancements in the application of a
  • Synthetic data v the real thing
    January 9, 2023
    ITS and smart cities thrive on data: but does all the data need to be real? Steve Harris of Mindtech explains why the answer could lie in combining elements of the real world with the synthetic
  • TomTom provides flexibility for Riyadh
    June 1, 2016
    With five years of traffic disruption ahead and an inadequate traffic monitoring system, the authorities in Riyadh needed a solution – and quickly. In preparation for embarking on what is currently the world’s largest metro construction project, the Arriyadh Development Authority (ADA) in Riyadh needed to put in place measures to minimise the additional congestion and travel delays the five-year project would inevitably cause.