Skip to main content

Eurasia tunnel opens

Turkey’s Eurasia tunnel, which links the European peninsula with the motorway network on the Asian side, has opened to traffic. The 5.4km long two-story tunnel, which is expected to alleviate Istanbul’s heavy congestion, aims to cut the travel time between the two sides of Istanbul by 85 minutes to only 15 minutes. Around 120,000 cars and light vehicles are expected to travel through the tunnel each day. The project also includes the construction of an additional 10km of access roads, two toll plazas
December 22, 2016 Read time: 1 min
Turkey’s Eurasia tunnel, which links the European peninsula with the motorway network on the Asian side, has opened to traffic.

The 5.4km long two-story tunnel, which is expected to alleviate Istanbul’s heavy congestion, aims to cut the travel time between the two sides of Istanbul by 85 minutes to only 15 minutes. Around 120,000 cars and light vehicles are expected to travel through the tunnel each day.

The project also includes the construction of an additional 10km of access roads, two toll plazas with electronic toll collection and the operations buildings for the tunnel.

Related Content

  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • ASECAP examines tolling’s trials, tribulations and triumphs
    September 4, 2018
    If you want to get up to speed on the main issues facing the transport sector and tolling companies, ASECAP Study Days event in Ljubljana was a good place to start. Colin Sowman reports (Photographs: Louis David). Increasing populations, ever-higher technical and safety requirements, and electric and hybrid vehicles will provide both challenges and opportunities for tolling companies. The annual Study Days event organised by ASECAP (the European association for tolling companies) examined all of these aspec
  • Indra supervises 9km tunnel in Columbia
    September 3, 2019
    Indra and engineering firm Eléctricas de Medellín Ingeniería y Servicios has commissioned a control centre and a back-up centre to supervise a 9km tunnel in Columbia. Both centres will monitor the safety and revenue collection systems of the Túnel de Oriente, which serves as a transport link between the city of Medellín and José María Córdoba airport. It is part of Concesión Túnel Aburrá Oriente, a 24km road corridor that Indra is now managing via its Mova solutions. Indra says its toll solution Mova C
  • E-tolling is the new normal
    April 29, 2020
    Electronic tolling has become a cornerstone for the next wave of innovation, says IBTTA’s Bill Cramer. So is this the end of the road for toll plazas?