Skip to main content

Test article 2

For more information on companies in this article

Related Content

  • MET Labs accredited as first test lab for tolling interoperability certification
    August 22, 2012
    OmniAir Certification Services (OCS) has accredited MET Laboratories as the first test lab in the 6C-for-Tolling Certification Programme. This scheme is designed to ensure tolling tag and reader interoperability (IOP) across equipment vendors and toll facilities that choose to deploy equipment certified as compliant to the 6C Requirements Document as defined by the 6C Toll Operators Committee. It is based on the ISO/IEC 18000-6 (Type C) RFID protocol.
  • Detroit testing for Mobileye AVs
    September 15, 2022
    All-electric AV using both Lidar and radar will be on roads with safety driver in Michigan
  • Test Article template with a very very very very very very very very very very long title
    May 20, 2016
    Volvo Penta will begin production of 5 and 8litre industrial engines in India, aimed at the Indian market, next year. The company has already been supplying engines for industrial and marine applications, to customers in the country for more than two decades. The 5 and 8litre engines will be made for Indian customers at the VE Powertrain (VEPT) plant in Pithampur, near Indore. A new line will be added at the plant exclusively for the Volvo Penta engines. Volvo Penta will begin production of 5 and 8li
  • Mersey Gateway tests free flow tolling
    October 24, 2016
    Tolling specialist Emovis, which is to install and manage the toll system for the Mersey Gateway in the UK, is to test the technology on the Bridgewater Expressway prior to installation on the new bridge. The Mersey Gateway, a new six lane toll bridge over the Mersey between the towns of Runcorn and Widnes, is due to open in autumn 2017. The testing will be an important part of the preparation for the new free-flow tolling system, which will allow drivers to travel over the new bridge and the Silver J