Skip to main content

Swarco to present new innovations at Road Expo Scotland 2017

Swarco will showcase two new innovations, Profectus and Zephyr, at Road Expo Scotland that are designed with the intention of providing local authorities with control of school warning signs and control over traffic assets and strategy. Profectus is a central processing board that allows school signs and vehicle activated signs to be monitored and programmed to make the surrounding area safe during term time.
October 18, 2017 Read time: 2 mins

129 Swarco will showcase two new innovations, Profectus and Zephyr, at 6644 Road Expo Scotland that are designed with the intention of providing local authorities with control of school warning signs and control over traffic assets and strategy.

Profectus is a central processing board that allows school signs and vehicle activated signs to be monitored and programmed to make the surrounding area safe during term time. Local authorities can monitor whether a school sign is activating from a web browser, equipped with a zoom pan map showing the exact location of each sign. Fault notifications are sent via a web browser, SMS or email, to reduce the possibility of a broken sign going unnoticed. Energy consumption and temperature can also be evaluated.

Through Profectus’ browser interface, bespoke timetables can be created and also features ‘special days’, which sends different alerts on weekends and off-peak times. It has a single range of 300m but the additional external radio can carry a signal up to 6km, with additional ‘dummy’ signs to target longer distances.

Zephyr, a cloud-based system, allows authorities flexibility over their assets, including variable message signs and trailer 537 VMS, car parking signs, VAS and school warning signs. Users can edit message and pictogram displays as well as upload new text and graphics as required.

The interface comes with Traffic Signs Regulations and General Directions 2016 rule checker to ensure that any free-hand messages comply with appropriate industry regulations.

Pan/zoom maps, enable each of the assets to be located and their status monitored such as the current messages displayed, schedules for any changes that are due, and red flags for any faults or errors that could impact the signs’ operation. The software also enables the segmentation of data to include traffic count or car park occupancy that can be detailed in a separate report.

For more information on companies in this article

Related Content

  • Prismatic solar powered variable message signs
    April 2, 2014
    According to Swedish company Triplesign, its new range of variable message signs (VMS), developed for lane closure operations has a number of benefits over traditional LED VMS. Visually, the sign is like a normal static traffic sign, but appearances can be deceptive. There are actually several signs built into each unit, one for each traffic lane on a multi-lane road. Each lane can be independently operated by the traffic management system.
  • Passport roundtable examines London’s kerb space priorities
    March 19, 2019
    UK congestion is getting worse, in part due to the influx of deliveries coming into cities. At a roundtable discussion in London, software provider Passport examined new ways in which local authorities can work together to better manage the kerb. Ben Spencer listens in Competition for kerb space is one of the major conundrums of modern urban mobility. Some authorities are being creative about it, but good practice is not widespread. “There are individual pockets of good work going on with cities who a
  • Video as a Sensor tech drives safer roadways
    October 1, 2021
    Bosch products integrate with partner offerings to provide end-to-end ITS safety solutions
  • USDoT pilots show win-win potential for connected vehicles
    December 19, 2017
    Pete Goldin discovers the state of play with connected vehicles trials in the US and the impact of Hurricane Irma on Tampa’s pilot. The US Department of Transportation’s (USDoT’s) connected vehicle (CV) pilot sites have moved into phase 2 of the deployment programme– design, build, test and, maybe most importantly, collaborate.