Skip to main content

IRD to deliver Georgia weigh station project

In a US$8 million contract, International Road Dynamics (IRD) will provide the design, supply, installation and integration of 19 mainline weigh-in-motion (WIM) systems at various locations throughout the state of Georgia in the US. The contract includes mainline WIM scales on the interstate, roadside and scale house electronics, licence plate reading (LPR), USDOT number reading and side view cameras and over-height detection systems at a total of 19 weigh station locations. The systems to be provided w
January 6, 2015 Read time: 2 mins
In a US$8 million contract, 69 International Road Dynamics (IRD) will provide the design, supply, installation and integration of 19 mainline weigh-in-motion (WIM) systems at various locations throughout the state of Georgia in the US.
 
The contract includes mainline WIM scales on the interstate, roadside and scale house electronics, licence plate reading (LPR), USDOT number reading and side view cameras and over-height detection systems at a total of 19 weigh station locations. The systems to be provided will complement and enhance the automated ramp weigh station facilities previously provided by IRD that are currently being operated by the 754 Georgia Department of Transportation.  

Each new system will be used to collect and transmit WIM data to the Georgia Department of Transportation traffic management centre, Georgia Department of Public Safety/Motor Carrier Compliance and other entities throughout the state.  It is anticipated that construction will start in 2015 and is expected to be completed by the end of 2016.
 
Following the construction phase, IRD will also provide equipment warranty and maintenance services as required to keep all systems operational for a period of five years.
 
Terry Bergan, IRD's president and CEO stated: "IRD is pleased to provide the Georgia Department of Transportation with state of the art weigh station and enterprise reporting solutions that will help the State ensure the efficient operation of commercial vehicle traffic thus allowing for sustainable and safe transportation growth."

For more information on companies in this article

Related Content

  • Travel times halve for tolling converts
    August 5, 2013
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv
  • Kapsch TrafficCom wins big in Sydney
    December 9, 2014
    The WestConnex Delivery Authority (WDA) in Sydney, Australia, has awarded Kapsch CarrierCom subsidiary, Kapsch CarrierCom Australia, the contract to supply a roadside tolling system to support capacity enhancement to the M4 motorway widening project as part of Stage 1 of the WestConnex motorway scheme in Sydney. The award covers two contracts for the initial phase of the project, one for the roadside equipment for the M4 widening segment and one for maintenance and support. The project is designed to in
  • Visionstream secures Australian motorways project
    February 11, 2013
    Visionstream Australia (Visionstream) is to deliver the Intelligent Transport System (ITS) and communications infrastructure for the Westgate Freeway Managed Motorway Project under the National Smart Managed Motorways Program. The US$21.5 million contract includes design and construction of the ITS system and an operations and maintenance component for two years. Under the contract, Visionstream will be undertaking the design, supply, installation and integration of ITS devices including lane use signs, va
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in