Skip to main content

Feiring Bruk reports 88% reduction in fines with CDE plant

Family-owned business Feiring Bruk, which operates primarily in eastern Norway where it has 10 sites extracting and producing crushed stone, gravel and asphalt, has announced an 88% reduction in fines as a result of its wet processing plant commissioned with CDE.
August 16, 2019 Read time: 3 mins
Feiring Bruk has announced an 88% reduction in fines as a result of its CDE wet processing plant

The company announced the success of the project at a recent open day event, organised in partnership with the leading Northern Ireland-headquartered wet processing equipment manufacturer.

As well as its multiple sites in the east of the country, Feiring Bruk works across Norway for clients using mobile crushing and screening plants. Modularity and mobility are at the core of equipment designed by CDE and this was an important factor for Feiring Bruk, whose operations rely on portability.

Having amassed fines stockpiles at Lørenskog quarry alone, Feiring Bruk was keen to identify a solution that would allow the material to be processed and valuable product recovered.

“We had a massive warehouse filled with material we had been unable to exploit, and which previously would have been deposited,” explains Trygve Ollendorff, CEO at Feiring AS. “With our new facility we extract washed out particles of zero size and can recover a range of new products our previous system was unable to process.”

The washing plant at Feiring Bruk’s Lørenskog quarry has been operational since 2016. It comprises an M2500 E5X mobile washing plant with integrated hopper, feed conveyor and P3-75 Infinity Screen and EvoWash sand washing plant. For water processing there is an AquaCycle thickener with automatic dosing station, AquaStore water storage tank and a secure control station.

Tormod Wæhle, technical manager at Feiring Bruk, says laboratory tests show significant fines reductions to just 8kg per tonne.

“After a series of analyses, we have determined that our system washes out 88 per cent of the fines,” he said. “Before washing, the material contains 65kg of fines per tonne, whereas the washed product has just 8kg of fines per tonne. In fraction 0–20, they have measured 6.5 per cent fines before washing. After washing, the fines content is reduced to 0.75%.”

Feiring Bruk (4).JPG
At a recent open day event, Feiring Bruk revealed how using a CDE wet processing plant has given the company big production and efficiency gains

Eunan Kelly, CDE regional manager– Northern Europe, said: “A common problem for sand and aggregate processors is finding an outlet for the large volumes of 0-20 produced. Using its new CDE washing plant, designed using the CDE co-creation approach which sees engineers work closely with the customer throughout the design and commissioning process, Feiring Bruk is able to make use of a very large proportion of the excess product.”

CDE systems are designed to recirculate up to 90 per cent of water used, helping to reduce the volume of fresh top-up water required. In addition to the water conserved within the system, the Feiring Bruk plant has been placed on a sloped asphalt surface which allows water to flow into the water basin which has been created to act as a reservoir, creating almost a closed system.

Products extracted using the new washing plant are attracting the attention of new and prospective customers in Norway for their improved grading accuracy.

“Our customers want drainage gravel in fraction 8–16 to avoid fines. Now we can supply excellent drainage gravel in fraction 4–16 that has been washed and is free of fines,” says Wæhle. “We’re making much better use of the raw materials.”

Related Content

  • Progress in talks on new Sydney toll road
    October 10, 2013
    Toll roads operator Transurban says it has made good progress in its talks with the New South Wales government on a US$2.5 billion tunnel proposal for Sydney's north. The proposed project would be a tolled motorway linking the M1 Pacific Motorway, formerly the F3 freeway, at Wahroonga to the M2 toll road at West Pennant Hills. The project involves the construction of new eight kilometre tunnel, which would be the longest tunnel of its kind in Australia. “We have made significant progress in our disc
  • Asecap announces new president for 2025
    January 6, 2025
    Konstantinos Koutsoukos takes over from Julián Núñez at tolling organisation
  • The search for travel management's Holy Grail
    October 10, 2018
    Combining accurate network estimates and forecasts with real-time information is the way to deal with traffic hot spots. Alan Dron looks at products which aim to achieve just that. Traffic management authorities have for years been trying to get ahead of the game. Instead of reacting to situations, they want to be able to head them off as they occur – or even before they happen. Finding that Holy Grail of successfully anticipating problems will save time, tension and tempers on city streets. Two new system
  • Investing in ITS: Show us the money
    April 8, 2022
    The ITS industry is currently attracting a lot of interest from private equity and venture capital providers. Adam Hill asks some of the people who have their eyes on the market what makes it such a good bet