Skip to main content

Green Light WIM

Beginning in the 1990s, Oregon was one of the first US states to use weigh-in-motion scales and transponder-based systems to enable trucks to avoid having to stop at weigh stations. Its Green Light preclearance system soon became a model for similar deployments throughout the country. Today, Green Light annually weighs and screens 1.6 million trucks as they approach 21 Oregon weigh stations and it preclears 1.5 million of them.
July 30, 2012 Read time: 4 mins
Preclearance systems use single load cell weigh-in-motion scales and dedicated short-range communication transponders to weigh and identify trucks at freeway speed as they approach a weigh station.
RSSBeginning in the 1990s, Oregon was one of the first US states to use weigh-in-motion scales and transponder-based systems to enable trucks to avoid having to stop at weigh stations. Its Green Light preclearance system soon became a model for similar deployments throughout the country. Today, Green Light annually weighs and screens 1.6 million trucks as they approach 21 Oregon weigh stations and it preclears 1.5 million of them.

It's apparent that a preclearance system like Green Light benefits truckers as, obviously, it's a waste of time and money for them to stop at weigh stations. The State of Oregon and its regulators clearly benefit, too, because as more trucks are screened and kept on the mainline, weigh station operators have more time for trucks likely to have a size, weight or safety problem. Preclearance even yields obvious global benefits by reducing greenhouse gases.

While all that's apparent, Oregon has actually quantified the gains realised through Green Light.

Project:
Green Light Weigh Station Preclearance System - Oregon

Cost:
$25 million (initial capital cost) for 21 systems

ROI:
$14.7 million in truck operating costs, over $600,000 in fuel savings and 125,000 hours of travel time saved per year

Benefits:
Additional 1.5 million trucks annually weighed, screened and signalled to go past weigh stations
Less particulate matter (0.5 tons), less hydrocarbons (1 ton), less carbon monoxide (2.4 tons), less nitrogen oxides (8 tons), and less carbon dioxide (1,300 metric tons) emitted by trucks each year.

Savings for truckers

In 2004, the American Trucking Associations examined the fixed costs of operating a heavy truck and found it amounts to $2.80 per mile. That includes 0.551 for driver wages, 0.804 for other wages and benefits, 0.198 for fuel, and 0.651 in equipment rents and purchased transportation. Based on their estimate that trucks average 42mph from point of origin to delivery, the $2.80 per mile cost is equivalent to $1.96 per minute. That means if a truck spends five minutes stopping at a weigh station, Green Light saves truckers $14.7 million in operating costs and 125,000 hours of travel time when it enables them to avoid 1.5 million stops.

Savings for the state

Preclearance systems boost a weigh station's capacity without physically expanding the facility. Were it not for Green Light, 10 Oregon stations would need to extend off-ramps and add static scales at a cost of over $2 million per site. Another five stations would become obsolete because there's no room to expand them. Instead of those sizeable costs, Oregon maintains its preclearance systems for $150,000 per year, plus the cost of parts.

Green Light protects the public's investment in roads and bridges. Overweight trucks annually cause an estimated $670 million in pavement damage to the US's highways. Oregon State University researchers estimate that Green Light saves Oregon $20 million a year.

Global savings

Oregon Department of Environmental Quality tests show that trucks are far less polluting and far more fuel efficient when they don't stop at weigh stations. There's a 36-67 per cent reduction in pollutants and a 57 per cent increase in fuel economy when trucks avoid decelerating and accelerating to enter and exit
a station.

Because Green Light annually allows 1.5 million trucks to avoid weigh station stops, Oregon skies are subjected to 0.5 tons less particulate matter, 1 ton less hydrocarbons, 2.4 tons less carbon monoxide, 8 tons less nitrogen oxides, and 1,300 metric tons less carbon dioxide. All this, plus over $600,000 in fuel savings.

Oregon size and weight enforcement

With 87 weigh stations, including six Ports of Entry and dozens of sites for portable weighing operations, Oregon annually weighs over 2 million trucks on static scales and another 1.5 million on Green Light weigh-in-motion scales. This size and weight enforcement effort protects the transportation infrastructure while assisting in collection of the state's weight-mile tax. Auditors use records of when trucks crossed scales to verify highway-use tax reports. The weight and distance tax applies to all trucks over 26,000lbs. They pay no fuel tax for travel in Oregon. The leadership taken by Oregon DOT to work in partnership with IRD (69 International Road Dynamics) to develop and deploy the Green Light Programme has resulted in a world-class weight enforcement system which considers environmental needs and financial savings to the trucking industry. IRD has also provided similar systems to highway departments in over 28 US states, including Georgia, Wisconsin, Illinois, Washington State, Hawaii and Alaska; and also globally, including systems on highways in India, South America, Thailand, Botswana, Saudi Arabia and others.


RSS

For more information on companies in this article

Related Content

  • IRD takes the strain in Melbourne
    October 10, 2016
    International Road Dynamics (IRD) is presenting its new SAW III portable axle scale and VectorSense sensor technology here at the ITS World Congress Melbourne.
  • IRD aids in monitoring the effect of an evacuation
    September 18, 2017
    International Road Dynamics (IRD) supported Georgia Motor Carrier Compliance Division (MCCD) in advance of Hurricane Irma’s landfall to advise on ways in which MCCD could monitor the traffic at their weigh stations and provide useful information to internal and external stakeholders. MCCD, the agency responsible for weight and safety enforcement in the state, indicated they were already watching the IRD Virtual Weigh Station (VWS) websites very closely.
  • Joining old and new in Canada’s Highway 407
    June 17, 2016
    David Arminas visits Canada’s Highway 407 ETR to see how the concession is working and hear about new arrangements for the roadway’s extension. The Toronto region is North America’s eighth largest metropolitan area and its roads become notoriously congested. In 1997 Highway 407, a 68km concrete toll motorway which skirts the northern edge of Toronto, was opened and initially operated by the province and CHIC - a consortium of four leading Ontario-based companies. Finance came from the Ontario Financing Auth
  • Australian road pricing, road funding needs more debate
    January 31, 2012
    Everyone in the road transport industry in Australia is talking road pricing - everyone, that is, except the politicians. Christine Keyes reports. At the end of 2008, Australia's road transport industry was wringing its collective hands, unable to raise more than $100 million from an individual bank for any Public Private Partnership (PPP). The A$750 million Peninsula Link project, announced by the Victoria Government in March 2009, was the first road project in the country to be put out to market as an ava