Skip to main content

Winsted releases Paramount control room credenza

Winsted Control Room Solutions has unveiled the Paramount technology credenza.
February 14, 2020 Read time: 1 min
'Reconfigurable': Winsted's Paramount credenza

“The technology needs of control rooms are becoming more and more sophisticated,” said Winsted president Randy Smith. “As a technical furniture provider, it’s our responsibility to create solutions that provide the best option to configure and protect a control room’s electronics.”

Paramount credenzas are designed to be “modular, reconfigurable and expandable for any space and operation”, the company insists, adding that the standard one-, two- and three-bay configurations can be combined and customised to create larger layouts. 

The credenzas feature a vented base that allows for optional 3” casters and 120mm fans, along with six top 50mm fans and cable management. They also include an optional Versa-Trak monitor mounting system and front and rear 14U tapped rack rails in each bay.
 

For more information on companies in this article

Related Content

  • Huawei addresses congested, separated rail networks with cloud solution
    December 20, 2024
    A shift to a cloud-based operating regime solves the problems of trying to make cluttered, geographically-discrete terrestrial systems work together
  • No in-road equipment for Queensland's free flow toll bridge
    February 1, 2012
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.
  • Lufft’s MARWIS moves weather
    September 22, 2014
    A mobile road weather sensor is providing authorities with new options for monitoring road conditions and winter maintenance operations. Road and traffic engineers know the vulnerable points in their network – cold spots where ice forms first, high-banked roads where snow accumulates, fog pockets… Traditionally, most authorities will position weather stations at these points to detect and monitor road conditions during bad weather events.
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.